Similar Projects
Lift and Pump Stations, Sanitary Sewers Construction Project Lead, Lafayette, IN (Tippecanoe County)
Last Updated | 02/03/2022 01:39 PM |
Project Title | 40 and 8 Lift Station and Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Lafayette, IN (Tippecanoe County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The installation of one new submersible non-clog lift station, 20 LF of 10” PVC Gravity Sew- er with granular backfill, 42 LF of 6” Ductile Iron Force Main, one 48” Doghouse Sanitary Man- hole, 100 LF of 16” HDPE Cas- ing w/ 8” HDPE Carrier Pipe via horizontal directional drilling, 2,861 LF of 8” HDPE Force Main via horizontal directional drilling, connections to existing sanitary manholes, electrical equipment, fencing, clean-up and restoration, 15 VF of Ce- mentitious Manhole Lining with Epoxy Coating, and all other work and appurtenances neces- sary for complete installation. Additionally, work shall include demolition of the existing lift sta- tion, which consists of a precast concrete wet well, an adjacent steel dry well, and ancillary equipment. The Alternate Bid No. 1 Work shall include • The installation of one new submersible non-clog lift station, 20 LF of 10” PVC Gravity Sew- er with granular backfill, 42 LF of 6” Ductile Iron Force Main, one 48” Doghouse Sanitary Man- hole, 100 LF of 16” HDPE Cas- ing with 8” HDPE Carrier Pipe via horizontal directional drilling, 497 LF of 8” HDPE Force Main via horizontal directional drilling, 2,364 LF of 8” HDPE Force Main via open excavation, con- nections to existing sanitary manholes, electrical equipment, fencing, clean-up and restora- tion, 15 VF of Cementitious Manhole Lining with Epoxy Coating, and all other work and appurtenances necessary for complete installation. Addition- ally, work shall include demoli- tion of the existing lift station, which consists of a precast con- crete wet well, an adjacent steel dry well, and ancillary equip- ment. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |