Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

Salem Hills Elementary School Parking Lot Reconstruction
Infrastructure
Bidding
$2,121,212 CJ est. value
Inver Grove Heights, MN 55077

Salem Hills Elementary School Parking Lot Reconstruction
Infrastructure
Bidding
$2,121,212 CJ est. value
Inver Grove Heights, MN 55077

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New County Library at Marie and 7th Avenues - Dakota County
New Construction, Infrastructure - 16,146 SF
Post-Bid
$6,000,000 CJ est. value
South Saint Paul, MN 55075

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Last Updated 01/11/2023 03:35 AM
Project Title

CSAH 23 (Cedar Avenue) Pedestrian Overpass at 140th Street - 99-012 - Dakota County

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $3,467,800 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a grade-separated pedestrian overpass of CSAH 23 (Cedar Avenue) north of the 140th Street intersection in Apple Valley. The project will improve intersection operations, make safety improvements (reduce pedestrian/vehicular conflict), and provide for increased traffic levels. The proximity to the METRO Red Line 140th Street station will also provide for enhanced access to transit. As of January 11, 2023, this project is currently in the Dakota County 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the County's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents