Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

RFP - Water Utility Rate Study
Term Contract
Bidding
North Plains, OR 97133

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Bagan Park - 92067 - City Of Tigard
Infrastructure
Conception
$935,000 CJ est. value
Tigard, OR 97223

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Rock Creek Campus Barn Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Portland, OR 97229

Last Updated 11/16/2022 06:04 AM
Project Title

Rock Creek Recycled Water Pipeline Project

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97123   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,331,050 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

\Before Bidders can submit their Bids, they will need to register with Bid Locker at website. There is no cost to register. First-Tier Subcontractor Disclosure Forms must be electronically submitted to Bid Locker at or before 4:00 p.m. local time on the same day (Deadline). If Bidder fails to submit a disclosure form with the information required by the stated Deadline, the Bid will be deemed nonresponsive and will not be considered. Clean Water Services (Owner) will not accept Bids by facsimile or email. Contractor shall complete the work as specified or indicated in Owner's Contract Documents for the Project. The Project consists of work that is generally described as follows (collectively, Work): 1. Construct approximately 105 feet of 6-inch and 8-inch diameter ductile iron transmission main that is installed both above grade and via open cut trench. Includes approximately 35 feet of 8-inch ductile iron piping from existing pump station pipe that will be reused, located within the Rock Creek Treatment Facility property owned and operated by Owner; 2. Construct approximately 70 feet of 10-inch diameter ductile iron transmission main that is installed via open cut trench and a section installed above grade and discharging into the Secondary Diversion Structure, located within the Rock Creek Treatment Facility property owned and operated by Owner; 3. Construct approximately 275 feet of 12-inch diameter High Density Polyethlyene (HDPE) transmission main that will be utilized as a "pump to waste" line and will be installed via open cut trench and located within the Rock Creek Treatment Facility. The design of this project was completed by the owner's in-house design professional.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents