Last Updated | 11/16/2022 06:04 AM |
Project Title | Rock Creek Recycled Water Pipeline Project |
Physical Address | View project details and contacts |
City, State (County) | Hillsboro, OR 97123 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,331,050 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | \Before Bidders can submit their Bids, they will need to register with Bid Locker at website. There is no cost to register. First-Tier Subcontractor Disclosure Forms must be electronically submitted to Bid Locker at or before 4:00 p.m. local time on the same day (Deadline). If Bidder fails to submit a disclosure form with the information required by the stated Deadline, the Bid will be deemed nonresponsive and will not be considered. Clean Water Services (Owner) will not accept Bids by facsimile or email. Contractor shall complete the work as specified or indicated in Owner's Contract Documents for the Project. The Project consists of work that is generally described as follows (collectively, Work): 1. Construct approximately 105 feet of 6-inch and 8-inch diameter ductile iron transmission main that is installed both above grade and via open cut trench. Includes approximately 35 feet of 8-inch ductile iron piping from existing pump station pipe that will be reused, located within the Rock Creek Treatment Facility property owned and operated by Owner; 2. Construct approximately 70 feet of 10-inch diameter ductile iron transmission main that is installed via open cut trench and a section installed above grade and discharging into the Secondary Diversion Structure, located within the Rock Creek Treatment Facility property owned and operated by Owner; 3. Construct approximately 275 feet of 12-inch diameter High Density Polyethlyene (HDPE) transmission main that will be utilized as a "pump to waste" line and will be installed via open cut trench and located within the Rock Creek Treatment Facility. The design of this project was completed by the owner's in-house design professional. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||