Similar Projects
Last Updated | 09/18/2023 11:18 AM |
Project Title | Clear Creek and Clear Lake Campground Habitat Restoration |
Physical Address | View project details and contacts |
City, State (County) | Naches, WA 98937 (Yakima County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2024 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The goal of this project is to remove trees in preparation for the Bureau of Reclamation constructing a new fish passage structure. Approximately 2 acres with .200 trees will be harvested, with and without root balls, removed from the harvest unit, and hauled to two locations for placement instream to enhance fish habitat and mitigate bank erosion. Root wad tipping will be preferred throughout the harvest area where conditions allow. Root wad tipping and removal will be required in approximately 1. acre or % of the harvest area (Shown in the appendix in Figure 3). Work done in the harvest unit shall have erosion control measures implemented to protect the site over inter/spring months. Project Location The project areas are located at Clear Lake Dam, Clear Lake South Campground, and. Clear Creek in the Okanogan Wenatchee National Forest in T13 R12 Sections 02 and 12. For site details, please refer to figures 2, 3, 4, and 5 in the appendix of this bid package. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |