Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

Bandera County Annex Building Construction
New Construction, Infrastructure
Design
Bandera, TX 78003

Beaumont Pioneer Crossing / Clubhouse
New Construction, Infrastructure - 2,502 SF
Design
$450,000 CJ est. value
Lufkin, TX 75904

BU 82-F - Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,313,722 CJ est. value
Archer City, TX 76351

SH 35 - Interchange Improvement (New or Update)
Infrastructure
Bidding
$26,319,342 CJ est. value
Rockport, TX 78382

HSH Surgical Ambulatory Regional Centers
Infrastructure, Build-out - 8,031 SF
Post-Bid
$1,500,000 CJ est. value
Lufkin, TX 75904

Water System Improvements
New Construction, Infrastructure
Post-Bid
Bandera, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

New Water and Wastewater Lines on South Sylvan
Infrastructure
Construction
$286,155 CJ est. value
Palestine, TX 75801

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Butler Park Apartments Multifamily Development
New Construction, Infrastructure - 68,841 SF
Pending Verification
$18,776,400 CJ est. value
Andrews, TX 79714

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

FM 1333 - Hazard Elimination and Safety
Infrastructure
Bidding
$5,877,527 CJ est. value
Charlotte, TX 78011

Last Updated 02/13/2023 11:41 PM
Project Title

Coshatte Standpipe Water Storage Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Bellville, TX 77418   (Austin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $199,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the 116,000-gallon Standpipe QA Expiration Date has changed from nothing to 8/15/2022 12:00:00 AM CST The CONTRACTOR hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete the same within one hundred twenty (120) calendar days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents