Similar Projects
Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

Pump Replacement for JBM Pump Station
Results
Less than $198,844 est. value
Herriman, UT

SLC WRF Influent Pump Rebuild Project
Results
Less than $369,000 est. value
Salt Lake City, UT

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

River Oaks Pump Station
Results
Sandy, UT

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

Welby Pump Station Canal Turnout and Storm Drain Sleeve
Results
South Jordan, UT

Jack and Bore-Lift Station CM-GC
New Construction, Infrastructure
Post-Bid
Salt Lake City, UT 84129

15000 South PI Pump Station
New Construction
Results
Less than $500,000 CJ est. value
Bluffdale, UT 84065

Zone 3 Secondary Booster Pump Station Project
New Construction
Post-Bid
Salt Lake City, UT

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Results
West Valley City, UT 84120

Airport Pump House #5 Renovations
Renovation
Post-Bid
Salt Lake City, UT 84116

5th and U Pump Station Improvements and Backup Power
Renovation, Alteration
Results
$1,035,675 est. value
Salt Lake City, UT 84103

2022 Channel Grinder Replacements
Renovation
Post-Bid
Salt Lake City, West Valley City, UT 84119

Last Updated 03/08/2022 10:30 AM
Project Title

Well and Pump Station Maintenance and Repair Service Contract

Physical Address View project details and contacts
City, State (County) Sandy, UT 84092   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents