Similar Projects
Newman Road Culvert Replacement
Bidding
Less than $150,000 est. value
Pennsburg, PA 18073

Simmons Elementary School Pool Filtration, Chlorination, and Drainage Upgrades
Post-Bid
Horsham, PA 19044

Meadow Brook - Flood Control
Results
Less than $6,210,000 est. value
Meadowbrook, PA

Schultz Road Culvert Replacement
Results
$90,000 est. value
Tylersport, PA 18971

Balligomingo and Brandywine Creek Road Slide Restoration
Results
$5,000,000 to $7,499,999 est. value
PA

Wissahickon Creek Stabilization and Enhancement
Results
$250,000 est. value
Blue Bell, PA 19422

Area B Streambank Stabilization
Results
Less than $75,000 est. value
PA

Fennel Road Culvert Project
Results
Less than $150,000 est. value
PA

Rowland Community Center Wall
Results
Cheltenham, PA 19012

Defford/Clyston Roads Retrofit Basin
Results
$40,000 est. value
Worcester, PA 19490

Knox Basin Improvements
Results
$190,000 to $195,000 est. value
Ardmore, PA 19003

Sinkhole Repairs
Results

Growing Greener 2016 Project - Stormwater Management BMP Control Measures Roychester Park - Evergreen Manor Park
Results
Less than $180,000 est. value
Abington, PA 19001

2019-2021 UMT Emergency Sinkhole Repair Contract
Results
King of Prussia, PA

Spring House Roadway Improvements Project Phase 1 - Sumneytown Pike Culvert Extension
Results
$700,000 to $800,000 est. value
Spring House, PA 19477

Last Updated 03/15/2019 08:03 AM
Project Title

Summit Drive Culvert Replacement

Physical Address View project details and contacts
City, State (County) Upper Providence, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project includes providing all labor, materials and equipment to complete the removal of the existing 48” diameter Corrugated Metal Pipe culvert and replacing it with a new 48” diameter Ductile Iron Pipe and Reinforced Concrete Pipe culvert (approximately 140 LF) located in Summit Drive. This project also includes providing all labor, materials and equipment to remove and replace two 2’x6’ Type C Inlets and to modify openings in existing concrete storm structures to accept the new 48” diameter culvert pipe. The project will include diverting the existing stream around the work area, installing and maintaining erosion and sediment controls, providing maintenance and protection of traffic and restoration of all areas disturbed during the construction of the project.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents