Project Title | VA - Rehab Dynamic Message Signs and Improve Ped Signals |
Physical Address | View project details and contacts |
City, State (County) | TX (Dallas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,063,300 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 420 6002 Cl a Conc (Misc) Cy 1.500 1 432 6045 Riprap (Mow Strip)(4 In) Cy 9.350 2 500 6001 Mobilization Ls 1.000 3 502 6001 Barricades, Signs And Traffic Handling Mo 6.000 4 506 6042 Biodeg Erosn Cont Logs (Instl) (18") Lf 100.000 5 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 100.000 6 531 6001 Conc Sidewalks (4") Sy 3.500 7 531 6010 Curb Ramps (Ty 7) Ea 4.000 8 540 6002 Mtl w-Beam Gd Fen (Steel Post) Lf 75.000 9 540 6016 Downstream Anchor Terminal Section Ea 1.000 10 542 6001 Remove Metal Beam Guard Fence Lf 50.000 11 542 6002 Remove Terminal Anchor Section Ea 1.000 12 544 6001 Guardrail End Treatment (Install) Ea 1.000 13 544 6003 Guardrail End Treatment (Remove) Ea 1.000 14 618 6023 Condt (Pvc) (Sch 40) (2") Lf 76.000 15 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 47.000 16 618 6029 Condt (Pvc) (Sch 40) (3") Lf 305.000 17 620 6007 Elec Condr (No.8) Bare Lf 721.000 18 620 6009 Elec Condr (No.6) Bare Lf 1,319.000 19 620 6010 Elec Condr (No.6) Insulated Lf 5,178.000 20 658 6015 Instl Del Assm (d-Sw)Sz (Brf)Gf1 Ea 3.000 21 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 1,517.000 22 666 6228 Pavement Sealer 12" Lf 388.000 23 666 6230 Pavement Sealer 24" Lf 101.000 24 668 6076 Prefab Pav Mrk Ty c (w) (24") (Sld) Lf 420.000 25 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 16.000 26 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 101.000 27 678 6006 Pav Surf Prep For Mrk (12") Lf 1,517.000 28 678 6008 Pav Surf Prep For Mrk (24") Lf 420.000 29 682 6018 Ped Sig Sec (Led)(Countdown) Ea 16.000 30 684 6079 Trf Sig Cbl (Ty c)(12 Awg)(2 Condr) Lf 2,788.000 31 687 6001 Ped Pole Assembly Ea 7.000 32 687 6005 Remove Ped Pole Assembly Ea 1.000 33 688 6001 Ped Detect Push Button (Aps) Ea 16.000 34 688 6003 Ped Detector Controller Unit Ea 2.000 35 690 6009 Removal Of Cables Lf 102.000 36 690 6011 Install Of Cables Lf 50.000 37 6007 6010 Fiber Optic Cbl (Sngle-Mode)(6 Fiber) Lf 5,956.000 38 6007 6102 Relocate Fiber Optic Cable Lf 260.000 39 6027 6003 Conduit (Prepare) Lf 8,702.000 40 6027 6008 Ground Box (Prepare) Ea 36.000 41 6028 6001 Install Dms (Pole Mtd Cabinet) Ea 1.000 42 6028 6002 Install Dms (Foundation Mtd Cabinet) Ea 7.000 43 6093 6010 Remove Exist Fib Opt Dms Sys(Ty-2) Ea 8.000 44 6185 6002 Tma (Stationary) Day 16.000 45 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |