Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

2021 Latex Modified
Bidding
$3,534,000 est. value

2021 Plant Mix
Bidding
$704,000 est. value
VA

Aetna Willis Shaft Maintenance
Post-Bid
Midlothian, VA 23113

Construction of the Main Street Improvements Phase II - B
Post-Bid
Richmond, VA

Citywide Slurry Seal Program
Term Contract
Results
Richmond, VA

2020 Slurry Seal
Results
Less than $1,634,000 est. value

Route 10 (Whitepine To Frith) Widening
Bidding
Less than $8,700,000 est. value
VA

Helipad Renovation Project at DSCR
Post-Bid
$500,000 to $1,000,000 est. value
Richmond, VA

Construction, Otterdale and Old Hundred Intersection Improvements
Results
VA

Improve H Roads
Results
$1,000,000 to $5,000,000 est. value
Richmond, VA

Repair Parking Lot for Lotts Center
Results
$1,000,000 to $5,000,000 est. value
Richmond, VA

Downtown Buffered Bike Lanes 1st, 2nd and 3rd Streets Duval Street to Spring Street
Results
Richmond, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Plant Mix
Results
Less than $4,098,000 est. value

Last Updated 12/03/2020 10:45 AM
Project Title

Route 360 Eastbound Widening From Lonas Parkway to Castle Rock Road

Physical Address View project details and contacts
City, State (County) Chesterfield, VA 23832   (Chesterfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the construction of one 12-foot wide travel lane in the eastbound direction for a distance of approximately 3,600 feet and the addition of a right turn lane at Bridgewood Road. Improvements include curb and gutter with a 4-foot wide utility strip and a 5-foot wide concrete sidewalk. The work will include asphalt paving, concrete curb and gutter, storm drainage inlets and piping, a stormwater management facility, a new signal at Bridgewood Road, relocation of an existing water line and other items necessary for the completion of the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents