Similar Projects
5th Avenue and 17th Street Waterline Replacement
Bidding
Ford City, PA 16226

Water System Improvements
Infrastructure
Bidding
$150,000 est. value
Galeton, PA

Plastic Pipe
Post-Bid
Pittsburgh, PA 15123

Replacement of PVC Pipe
Post-Bid
PA 15143

Forcemain Improvement Project
Results
PA

Miller System Waterline Replacement Project
Results
Petrolia, PA 16050

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

CIPP Rehabilitation of Portions of the Monongahela Subaqueous Interceptors
Infrastructure
Bidding
$9,600,000 est. value
Pittsburgh, PA 15233

Installation of 150' of 6" C900, DR14, PVC
Post-Bid
Sewickley, PA 15143

Valve and Hydrant Maintenance Program - Central Lehigh Division
Term Contract
Results
Allentown, PA

Timber Run Water Service - General Construction
New Construction, Infrastructure - 180 SF
Bidding
$400,000 est. value
Montgomery, PA

Furnish Ductile Iron Pipe
Term Contract
Post-Bid
New Stanton, PA 15672

University Drive Road / Curb And Waterline Loop Repairs Sitework
Results
$900,000 est. value
Hazleton, PA 18202

Trout Avenue Water Line
Infrastructure
Bidding
Ligonier, PA 15658

W15QKN-20-Q-5243 - Replace Backflow Preventers, Coraopolis, PA CSS 17578 (PA166)
Post-Bid
Coraopolis, PA

Reported 08/04/2021 12:00 AM
Project Title

Eagle Street Utility Replacement Project

Physical Address View project details and contacts
City, State (County) Franklin, PA   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the installation of approximately 420 linear feet of 8 water line, 14 water service connections, 501 linear feet of 18 storm sewer, 237 linear feet of 8 sanitary sewer, 9 sanitary sewer laterals, appurtenances, and all related work. Work under this contract shall include all materials, equipment, supplies, and labor for the construction as shown and specified in the Contract Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents