Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

North Water Reclamation Facility Storage Expansion
Addition
Conception
$453,000 est. value
Palmetto, FL 34221

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

RFQ - WWRF Non-Surface Water Effluent Disposal Project
Infrastructure
Design
$2,000,000 CJ est. value
Largo, FL 33770

Waste Water Treatment Facility Improvements - Phase 2
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Davenport, FL 33837

Rehabilitation of South Clarifier at Waste Water Treatment Plant #3
Renovation
Bidding
$300,000 CJ est. value
Winter Haven, FL 33884

Fence Replacement at the Wastewater Treatment Plant
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Hollywood, FL 33019

Procurement of and Assembly of Portable Chiller Plants on Skid Flatbed Trailers
New Construction
Sub-Bidding
$2,500,000 CJ est. value
Naples, FL 34102

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

NE WRF Improvements
Results
Less than $19,000,000 est. value
Safety Harbor, FL 34695

Greenland Water Reclamation Facility (WRF)
Construction
$100,000,000 est. value
Jacksonville, FL 32202

Northside Water Reclamation Facility Headworks Rehabilitation
Construction
Lakeland, FL 33801

Southern Region Water Reclamation Facility Process Improvements
Infrastructure
Pending Verification
$22,500,000 CJ est. value
West Palm Beach, FL 33401

Last Updated 08/05/2022 11:03 AM
Project Title

Mechanical Screen for WWTF

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $489,700 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Furnishing all labor, materials, and equipment to install a perforated plate mechanical screen with washing compactor in an existing concrete channel, end suction washwater booster pump, 18 magnetic flowmeter, piping modifications, control panel, associated electrical work, and restoration at the Macclenny Wastewater Treatment Facility. Bids are requested for the following Contract: Mechanical Screen for WWTF. Completion- 180 days Bid security must be furnished in accordance with the Instructions to Bidders. To be considered qualified, Bidder must be licensed to engage in the business of contracting in the State of Florida by the Construction Industry Licensing Board and must have successfully completed a minimum of 3 projects of a similar nature involving mechanical screening within the past 10 years, each having a minimum contract value of $250,000. The City of Macclenny, Florida is an Equal Opportunity Employer. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents