Similar Projects
The Bristal at Boca Raton
New Construction, Build-Out, Demolition - 331,605 SF
Conception
Boca Raton, FL 33432

For The Children Community Center
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33460

Windsor Place
New Construction - 5,100 SF
Design
West Palm Beach, FL 33417

Golden Road Apartments
New Construction - 1,081,035 SF
Design
$10,000,000 CJ est. value
Lake Worth, FL 33461

Design Professional for Gramercy Park Neighborhood Center
New Construction, Infrastructure - 11,000 SF
Bidding
$5,200,000 est. value
West Palm Beach, FL 33406

Palm Springs Residences
New Construction, Demolition - 330,866 SF
Bidding
$10,000,000 CJ est. value
Palm Springs, FL 33406

Lee Square
New Construction - 1,217,016 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Demolition of Existing Community Center and Construction of New 14,799 SF New Community Center
New Construction, Demolition - 14,799 SF
Post-Bid
Jupiter, FL 33469

Development of Wellington Community Park
New Construction
Results
Wellington, FL 33414

Ocean Breeze East
New Construction - 7,532 SF
Construction
$25,935,792 est. value
Boynton Beach, FL 33424

Lakewood Road Apartments
New Construction - 467,757 SF
Construction
$14,100,000 est. value
Palm Springs, FL 33461

The Bexly at Boutwell
New Construction - 46,076 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33461

The Pierce
New Construction, Build-Out - 18,900 SF
Conception
$73,147,424 est. value
Boynton Beach, FL 33435

Lotis - Master Plan
New Construction - 535,987 SF
Design
$10,000,000 CJ est. value
Wellington, FL 33414

Casa Mara
New Construction, Build-Out - 371,974 SF
Construction
$16,546,761 est. value
West Palm Beach, FL 33405

Reported 04/22/2022 01:22 PM
Project Title

Brentwood Village Clubhouse

Physical Address View project details and contacts
City, State (County) Boca Raton, FL 33433   (Palm Beach County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method
Project Status Permitting, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,534,990
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Clubhouse/Social Club, 1 Story Above Grade, 5,723 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents