Similar Projects
Love's Travel Stop / Weed
New Construction
Design
$3,000,000 est. value
Weed, CA 96094

Fish Passage - Replace Culverts with Bridges
Infrastructure
Design
$4,878,000 CJ est. value
Yreka, CA 96097

Full depth pavement recycling with cement
Infrastructure
Bidding
$1,120,000 CJ est. value
Dorris, CA 96023

Dollar Tree - Store # 08645
New Construction - 10,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Weed, CA 96094

Walmart Neighborhood Market #2054-601 - CAPXHVAC-3
Renovation
Post-Bid
Jackson, CA 95642

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Weed E.S. New Admin / Classroom Building Increment 2 Bid Package WES 2022.2.31.b Earthwork / Concrete
Renovation, Infrastructure
Results
$1,850,000 CJ est. value
Weed, CA 96094

Rehabilitate Pavement
Infrastructure
Design
$33,790,000 CJ est. value
Tulelake, CA 96134

Newell Sewer Collection and Lagoon Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Newell, CA 96134

Discovery Marsh Trail
Infrastructure
Results
$758,450 CJ est. value
Tulelake, CA 96134

Pavement Rehabilitation
Infrastructure
Design
$22,645,000 CJ est. value
Weed, CA 96094

RFQ Contractor - Forest Service - Klamath National Forest Vault, Vault Liner and Site Preparation and Installation
Infrastructure
Post-Bid
$500,000 CJ est. value
Yreka, CA 96097

Place Hot Mix Asphalt (Type A) and Replace Asphalt Concrete Surfacing
Infrastructure
Results
$2,292,695 CJ est. value
Callahan, CA 96014

Pavement Preservation
Infrastructure
Design
$14,060,000 CJ est. value
Weed, CA 96094

CHP Mount Shasta Area office - Parking Lot Repairs Services
Infrastructure
Post-Bid
$200,000 CJ est. value
Mount Shasta, CA 96067

Last Updated 03/31/2023 03:11 PM
Project Title

Dollar Tree - Store #08645 (Rebid)

Physical Address View project details and contacts
City, State (County) Weed, CA 96094   (Siskiyou County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 10,080 SF Dollar Tree in Weed, CA. This phase of the project will consist of site work and building the shell of the building. Trades include, but are not limited to: Staking Erosion Controls Final Cleaning Concrete (Structural, Site, Retaining Wall Footing Details on Sheet S041, HVAC Pad, 7 Light Pole Bases, Transformer Pad, Three Bollards @ Transformer Pad) Concrete & Electrical: #1 VE OPTION: The owner is reducing the number of Light Poles from 7 to 3. Please include a PER LIGHT POLE cost in bid breakout. #2 VE OPTION: The concrete in front of the trash enclosure can be replaced with asphalt. We still need concrete slab within the enclosure. Concrete NOTE: Floor Plan (Sheet A1.1 Note #9) shows a concrete cut out for future plumbing work. Masonry (Building, Retaining Walls, trash Enclosure) Rough Carpentry: VE OPTION: The trash enclosure is extremely over designed. All we need are posts and board-on-board fence, with a wood gate for the enclosure. General Metal Fabrication #1 VE OPTION: Please include the price for the Two Double Swing Gates @ Trash Enclosure, Trash Enclosure Roof, 3 Bollards - Owner is comparing price of metal to wood gates. Would like to see both on bid. Insulation Doors Storefront Glazing (Windows) Drywall Metal Stud Painting (Exterior) EIFS & Stucco Plumbing (Minimal) PEMB Erection (Please provide the cost for the erection only- Building is already in storage) Plumbing HVAC Electrical VE OPTION: There are 6 temporary strip lights inside of the building. We can eliminate these. (Please add these costs to your bid as optional) Earthwork Retaining Walls #1 - Please provide VE OPTIONS on way to save money or reduce size of planned project. Asphalt Paving #1- VE OPTION: The concrete in front of the trash enclosure can be replaced with asphalt. We still need concrete slab within the enclosure. Striping Landscaping VE OPTIONS: Please provide cheaper options Site Utilities (Water Service, Irrigation Water Service, Sewer Service, Electrical, Gas, Storm) Etc. VE Option: There is no need to install 6" fire line from street to building. There are no sprinklers in the building. There are 6 temporary strip lights inside of the building. We can eliminate these. The concrete in front of the trash enclosure can be replaced with asphalt. We still need concrete slab within the enclosure. There is no need to install 6" fire line from street to building. There are no sprinklers in the building. The trash enclosure is extremely over designed. All we need are posts and board-on-board fence, with a wood gate for the enclosure.

Details

1 Story Above Grade, 10,080 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents