Similar Projects
Interquest Parkway Parking Lot
New Construction
Design
Colorado Springs, CO 80921

2021 Concrete Maintenance Project
Bidding
Salida, CO

Rocky Mountain Elementary Sidewalk Project
Bidding
Westminster, CO 80031

2020 Concrete Replacement
Post-Bid
Lone Tree, CO

Providence Village Rec Center Landscape and Site Civil Improvements
New Construction
Post-Bid
Highlands Ranch, CO

Van Buren Safe Routes to School Pedestrian and Bicycle Improvements
Results
Less than $500,000 est. value
Colorado Springs, CO 80903

Rehabilitating Curb Ramps on SH83, SH86, SH85 and I-25
Results
$1,000,000 to $5,000,000 est. value

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Travel Centers Of America Addition
New Construction - 5,600 SF
Pending Verification
Commerce City, CO 80022

Chenango Park Trail Reconstruction
Infrastructure
Bidding
Greenwood Village, CO

Concrete R & R at Various Locations
Post-Bid
Federal Heights, CO

2020 Citywide Bond Concrete Repair
Results
$2,250,000 to $2,750,000 est. value
Denver, CO

Downtown Parklets
Infrastructure
Bidding
Longmont, CO 80501

Fillmore North Mmt Route 6 Pedestrian and Transit Enhancements
Post-Bid
Colorado Springs, CO

PPRTA Cost Share Concrete
Results
Colorado Springs, CO

Last Updated 05/07/2021 10:49 AM
Project Title

Mt. Werner Circle Complete Streets 4B – Phase I

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO   (Routt County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installation of a new 8-foot wide sidewalk totaling 345 square yards, removal of existing asphalt, removal and replacement of existing curb and gutter, installation of a landscape retaining wall, utility work, landscaping and irrigation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents