Similar Projects
Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Resurface - US 62
Infrastructure
Design
$6,700,000 CJ est. value
Cache, OK 73527

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2017 AD Valorem Street and Roads Program Residential Phase I-C
Results
$1,700,000 to $2,200,000 est. value
Lawton, OK 73501

2017 AD Valorem Street and Roads Program Residential Phase I-A
Infrastructure
Results
$1,942,634 est. value
Lawton, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Chattanooga School Streets and Parking Lots Project in District 3
Infrastructure
Post-Bid
Lawton, OK

SH-76 Interchanges
Infrastructure
Results

Resurface - SH 49
Infrastructure
Design
$2,939,382 CJ est. value
Lawton, OK 73507

Indiahoma School Streets and Parking Lots Project in District 3
Infrastructure
Post-Bid
Lawton, OK

Waterline Fittings and Valves
Infrastructure
Results
Lawton, OK

Bridge and Approaches - SH 17
Infrastructure
Design
$1,209,600 CJ est. value
Fletcher, OK 73541

Relocating the Proposed Community Development Block Grant Project
Infrastructure
Post-Bid
Sterling, OK

ODOT Waterline Relocation
Infrastructure
Results
Geronimo, OK

Last Updated 09/22/2022 10:12 AM
Project Title

Advanced Individual Training Barracks, Fort Sill

Physical Address View project details and contacts
City, State (County) Fort Sill, OK 73501   (Comanche County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Single-Family Homes, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $112,507,415 [brand] Estimate
Plans Available from Agency's Affiliate - 07/07/21
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jun 03, 2022 Contract Award Number: W912BV22C0013 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Harper Construction Company, Inc. Contractor Awarded Address: Glendale, CA 91201 USA Base and All Options Value (Total Contract Value): $112507415.00 The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a new barracks construction project. Proposed project will be a competitive, firm-fixed price, design/bid/build contract procured in accordance with FAR 15, Negotiated Procurement using the trade-off process. This project will be for the construction of 180,000 SF barracks for 600 Soldiers to include: building information systems, fire protection and alarm systems, ARMS vault construction, FEMA and ICC 500 storm shelter, extensive fire separation requirements, video surveillance system installation, Intrusion Detection System (IDS) installation, and Energy Monitoring and Control Systems (EMCS) connection. Special Foundations are required. Supporting facilities include site improvements to include a canopy for covered hardstand, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping, and signage. Heating and air conditioning will be provided by self-contained systems and will incorporate geothermal wells and hybrid geothermal system integration Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Key personnel for construction are anticipated to include individual personnel for Site Superintendent, Project Manager, Quality Control Manager, Site Safety Health Officer, and QC specialized support to include specialized structural inspectors, commissioning agents, fire protection engineer, and sustainability/energy integration coordinator. The project will also require a full-time scheduler to maintain an accurate and complex schedule for USACE coordination utilizing Primavera scheduling software. In accordance with FAR 36/DFARs 236, the estimated construction price range for this project is between $50,000,000 and $100,000,000. Estimated duration of the project is 690 calendar days. The North American Industry Classification System code for this procurement is 236220 which has a small business size standard of $ 39,500,000. Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded. Large Businesses must comply with the FAR 52.219-9 by submitting a Small Business Subcontracting Plan should an award be made to a large business firm. TYPE OF SET-ASIDE: NONE - This requirement will be solicited as UNRESTRICTED. Anticipated solicitation issuance date is on or about 5 March 2021, and the estimated proposal due date will be on or about 4 April 2021. The official solicitation number W912BV21R0003 will be issued under contracting opportunities via www.beta.sam.gov, inviting firms to register electronically to receive a copy of the solicitation when it is issued.

Details

180,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents