Similar Projects
Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Valvoline Instant Oil Change
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Waukee, IA 50263

Valvoline Instant Oil Change
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Waukee, IA 50263

Journeys Kidz
Renovation - 2,042 SF
Post-Bid
West Des Moines, IA 50266

Starbucks Shell Building / Waukee
New Construction - 2,225 SF
Post-Bid
$600,000 est. value
Waukee, IA 50263

Waukee Schools 2022 Playground Improvements
Infrastructure
Results
$1,059,745 CJ est. value
Waukee, IA 50263

Highway 17 Utilities Extension - Rebid
Infrastructure
Results
$195,000 CJ est. value
Granger, IA 50109

The Iowa Clinic / Waukee
New Construction, Infrastructure - 40,000 SF
Construction
$23,000,000 CJ est. value
Waukee, IA 50263

South Grand Prairie Parkway - Grand Avenue to Raccoon River Drive - 0510 014 2021 - City of West Des Moines
Infrastructure
Construction
$8,500,000 CJ est. value
West Des Moines, IA 50261

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Lift Station #3 Upgrades - Phase 2
Infrastructure
Conception
$255,000 CJ est. value
Waukee, IA 50263

Last Updated 02/16/2024 03:12 PM
Project Title

Waukee Towne Center Mixed Use Development

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Retail, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 16, 2024, construction of the Target retail store is under way. Subcontractor bidding for the remainder of the project is possible April or May 2024. Target store is already under construction, Huff construction will be out this project in March or April of 2024. Sub contractors need to contact them to be qualified to bid when the project goes out to gid. https://www.businessrecord.com/15-new-commercial-projects-in-des-moines-area-get-building-permits/ A permit valued at over $25.3 million for the construction of a 148,000-square-foot Target that will anchor the 62-acre Waukee Towne Center southwest of the Hickman Avenue and Alice’s Road intersection in Waukee. The first phase of the $132 million project, described as a “lifestyle shopping center,” is expected to include a Target, smaller commercial spaces, an 8-acre lake and several outlots along Southeast Alice’s Road. Pierson Cos., located in Burlington, is developing the Waukee Towne Center. Construction of Target is expected to be completed in mid- to late 2024. -------------------------------------------------------------------- https://www.businessrecord.com/project-update-construction-to-start-this-spring-on-new-target-in-waukee/ WHAT: Target that will anchor Waukee Towne Center in Waukee DEVELOPER: Pierson Cos., based in Burlington PROJECT COSTS: First phase is estimated at $132 million PROJECT MANAGER: Ryan Cos. CONTRACTOR: DCI Group PROJECT UPDATE: A groundbreaking ceremony is planned at 3:30 p.m. Thursday at the site of the new Target in Waukee. The Minneapolis-based retailer will anchor Waukee Towne Center, a 62-acre commercial development planned just southwest of the Hickman Avenue and Alice’s Road intersection. The first phase of the $132 million project, described as a “lifestyle shopping center,” will include a 148,00-square-foot Target, smaller commercial spaces, an 8-acre lake and several outlots along Southeast Alice’s Road. Construction of the Target is expected to begin this spring and the store is expected to open in mid-2024, a city official said. _____________________________________________________________________________________________________________ Plans call for the construction of a mixed-use development. The project apeared before the Planning Commission for the City of Waukee on March 28, 2023, and is under review. No building permits have been submitted. An architect has been selected; however, iformation regarding the general contractor has not been released. A timeline for construction has not been announced.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents