Similar Projects
Westchester County ATCT HVAC Replacement
Term Contract
Design
$250,000 to $500,000 est. value
White Plains, NY 10604

Kitchen Exhaust Hood Cleaning and Maintenance Service
Term Contract
Design
Montrose, Wappingers Falls, NY 12590

Heat Pump System Service and Maintenance
Alteration
Bidding
Yonkers, NY

Heating Service and Maintenance
Alteration
Bidding
Yonkers, NY

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Services (Harrison Location)
Term Contract
Post-Bid
Rye Brook, NY 10573

HVAC Duct Replacement at Somers Intermediate School
Results
Somers, NY 10589

Daiken Condenser Unit Replacement
Results
Pleasantville, NY 10570

Repair/Replace Leaking Sanitary Line, Building 81 - HVAC
Alteration
Bidding
$250,000 to $500,000 est. value
Bedford Hills, NY 10507

Repairs to Leaking Boiler at Cacace Justice Center (Boiler 1)
Post-Bid
Yonkers, NY 10701

HVAC Upgrades to Tarrytown Recreation Center and Senior Center
Results
Tarrytown, NY 10591

Town Hall BMS Improvements Phase 2 and RTU-4 Replacement
Alteration
Bidding
White Plains, NY 10607

HVAC Upgrades at Saunders Trade and Technical High School
Post-Bid
Yonkers, NY 10701

Z1da--Replace Box 10 in Building 5
Results
Montrose, NY 10548

2022 Bid for Licensed HVAC/Plumbing Services
Alteration
Bidding
Ardsley, Hartsdale, White Plains, NY 10607

Reported 03/01/2022 12:00 AM
Project Title

Gas Conversion/HVAC Project for Roosevelt High School

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10710   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Gas Conversion/HVAC Project at Roosevelt High School - Single Prime HVAC Contract. The work under this section includes all labor, materials, equipment, tools, transportation, and the performance of all work necessary and required for the furnishing and installation complete of all work as shown on the Contract Documents, including but not necessarily limited to the following: 1. Provide and install new chimney flue liner system with specified cap and any boiler breaching connections. 2. Modify and provide new chimney wall penetrations. Patch and seal chimney wall penetrations and openings not used to match existing construction. 3. Rigging of equipment. 4. Firestopping per NFPA requirements (UL approved systems). 5. As-Built Drawings - Refer to Division 1. 6. Cutting and Patching - Refer to Division 1.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents