Similar Projects
Booster Station and Water Line Extension
Renovation, Infrastructure
Bidding
$375,000 est. value
Union City, TN

Shady Oaks Pump Station Improvements
Renovation
Bidding
TN

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

Lift Station 8 and 9 Replacement
New Construction
Post-Bid
Lexington, TN

Sequatchie Water Booster Pump Station
Results
Jasper, TN 37347

Upgrade of Green Gap and Roy Lane Pump Stations
Results
Chattanooga, TN

Sewer Grinder Station Installation
New Construction
Bidding
$143,000 est. value
Kimball, TN

Contract 121- Hayshed Road and Luke Lane Sewer Improvements
Post-Bid
Charlotte, TN 37036

Sewer System Improvements - Sewage Pumping Station Replacement at WWTP
Results
Pulaski, TN

Instrumentation and Controls Integrator
Renovation, Infrastructure
Bidding
Athens, TN

Influent Screening Improvements
New Construction
Post-Bid
Mount Pleasant, TN

2018-19 Lift Station Phase-Out
Renovation
Results
Johnson City, TN

Soddy Daisy Industrial Park Pump Station Controls and Force Main Upgrade (Phase I)
Renovation
Post-Bid
$250,000 to $500,000 est. value
Chattanooga, TN 37404

2020 ARC Project for Clayton Homes Pump Station and Force Main Conveyance
New Construction
Results
Rutledge, TN

Industrial Park Pump Station and Force Main
New Construction
Post-Bid
Columbia, TN

Last Updated 11/30/2021 10:31 AM
Project Title

Palmer Pumping Station DPC Installation

Physical Address View project details and contacts
City, State (County) Memphis, TN 38116   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal of the existing Distributed Process Control (DPC) System and installation of a new DPC System and all necessary appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents