Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Asphalt Milling/Pulverizing
Infrastructure
Post-Bid
WI

Traxler Parking Lot Improvements
Infrastructure
Post-Bid
Janesville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Crack Sealing
Infrastructure
Results
Beloit, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

Paving East Stateline Road from Dry Creek East to Freechurch Road
Infrastructure
Post-Bid
$300,000 est. value
WI

Last Updated 05/10/2023 05:01 PM
Project Title

2023 Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Milton, WI 53563   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $44,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The proposed construction consists of new sidewalk pathways at two parks. Work includes excavation, disposal of waste excavated materials, materials and installation, traffic control, turf restoration and other miscellaneous items of work. All Bids must be accompanied by a Bidder's bond for five percent (5%) of the total amount of the Bid as provided in the Bidder Instructions. If a successful Bidder fails to execute and file the required contract and bond, Bidder agrees to forfeit bid deposit to the City as liquidated damages. This Bid will remain open for 45 days after the date of Bid opening or for such longer period of time that Bidder may agree to in writing upon request of Owner.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents