Reported | 07/01/2022 10:34 AM |
Project Title | Relocation of Pan Am At-Grade Crossing - City of New Britain |
Physical Address | View project details and contacts |
City, State (County) | New Britain, CT (Hartford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $398,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work and paving for a road / highway in New Britain, Connecticut. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. The project involves the design and construction'Of Am railroad crossing. The existing crossing is located east of the Harry Truman Overpass (S.R. Route 71) and Columbus Boulevard. The project will relocate the existing point on Columbus Boulevard which will be approximately location will allow convenient access from the local garage to the CTfastrak Main Street Station and multi-use Figures shown below are tentative. Vendor selection ACtivity/Departaient: Public Works _ the-relocatiOn of the at-gracte.Pan on Columbus Boulevard approximately 100 feet connects the CTfastrak multi-use trail to crossing to The CTtransit local bus pulse 300 feet east of Main Street. The new bus pulse point and the City's Szczesny Parking trail. process requires further discussion. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 30, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |