Last Updated 08/24/2020 08:07 AM
Project Title

Parks Edge Storm Water Pump Station

Physical Address View project details and contacts
City, State (County) Missouri City, TX 77489   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a twelve-foot (12') diameter concrete cast-in-place wet well, including well point system and dewatering as necessary; two (2) mixed flow pumps with accessories, piping, valves, fittings, and supports; protective coatings; 9' x 29' cast-in-place concrete discharge trough; site work; wooden fencing and swing gate; concrete pavement; on-site storm sewer piping, including well point system and dewatering as necessary; natural gas generator and generator concrete pad; automatic transfer switch and load bank testing; pump station control panel; electrical service; disconnect switches; conduit; wire; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning facility.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents