Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Whitefish Lake State Park Chip Seal
Infrastructure
Bidding
$43,000 est. value
Whitefish, MT

Helena-Lewis & Clark 2018 Repairs, Phase 1
Term Contract
Bidding
Less than $5,000,000 est. value
Helena, MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Jackson Creek Road Improvements
Term Contract
Design

Trail Creek Salvage Road Work
Infrastructure
Bidding
Wisdom, MT

Overlay and Chip Seal SE of Fort Peck SE Wolf Point Area
Infrastructure
Post-Bid
Fort Peck, MT

Hudson Bay Divide South
Infrastructure
Results

Charles M Russell Refuge Repairs
Term Contract
Design
Glasgow, MT 59230

Grading, Overlay, Rumble Strips, Guardrail, Pavement Marking, and Signing on the Fromberg
Infrastructure
Bidding
MT

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Reported 03/25/2022 12:00 AM
Project Title

Mill and Fill, Seal and Cover, Guardrail, Curb, and Pavement Markings on the Whitehall

Physical Address View project details and contacts
City, State (County) MT   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mill & fill, seal & cover, guardrail, curb, and pavement markings on the Whitehall ? East project located in Jefferson County. The project begins at the intersection of Whitehall Street and Legion Avenue in Whitehall at RP 0.0 and extends east along Primary Route 69 (MT-69) for approximately 6.0 miles ending near the junction of MT-69 and Secondary Route 359 at RP 6.1 Section No. 0001 - Mill & Fill, Seal & Cover 104030010 Miscellaneous Work 10,000.000 Unit 109200005 Mobilization 1.000 Ls 208010000 Bmp Administration-ls 1.000 Ls 208010005 Par Bmp Administration-ls 1.000 Ls 208010200 Temporary Erosion Control-fixed 500.000 Unit 210020170 Test Trailer-transport,setup 60.000 Mile 301020625 Aggregate Treatment 603.000 Sqyd 401020045 Plant Mix Surf Gr S-3/4 in 11,543.000 Ton 401020300 Hydrated Lime 162.000 Ton 402020092 Asphalt Cement Pg 64-28 622.500 Ton 402020315 Emulsified Asphalt-tack Coat 6,095.000 Gal 402020375 Emulsified Asphalt Chfrs-2p 204.100 Ton 409000000 Final Sweep and Broom 6.000 Crmi 409000010 Cover-type 1 114,864.000 Sqyd 411010000 Cold Milling 120,340.000 Sqyd 411011130 Centerline Rumble Strips-type 3 5.300 Mile 552010160 Bridge Deck Crack Seal 212.500 Sqyd 603014242 Adjust Valve Box 13.000 Each 604000100 Adjust Manhole 3.000 Each 606010140 Guardrail End Section Widening 8.000 Each 606010330 Mgs Guardrail 4,675.000 Lnft 606010335 Mash W-beam Terminal Section 8.000 Each 606010385 Remove Guardrail 4,902.800 Lnft 609010160 Gutter-conc Valley 103.700 Sqyd 609010200 Curb and Gutter-conc 1,611.000 Lnft 618030015 Traffic Control-fixed 500.000 Unit 618030080 Traffic Control-ls 1.000 Ls 619010058 Signs-alum Sheet Incr Iv 108.000 Sqft 619010062 Signs-alum Sheet Incr Xi 64.000 Sqft 619010086 Signs-alum Refl Sheet Iv 185.200 Sqft 619010090 Signs-alum Refl Sheet Xi 431.700 Sqft 619010230 Remove Sign 79.000 Each 619010240 Remove Sign-guide 2.000 Each 619010300 Posts-tubular Steel 471.000 Lb 619010310 Posts-steel U Sign 112.000 Lb 619010320 Posts-steel Structural Sign 620.000 Lb 619010340 Posts-tubular Steel-sq-perf 272.000 Lb 619010480 Poles-treated Wood 4 in 338.000 Lnft 619010490 Poles-treated Wood 5 in 110.000 Lnft 619010720 Frang Sign Post Bkwy-s3 X 5.7 2.000 Each 619010722 Frang Sign Post Bkwy-s4 X 7.7 4.000 Each 619010740 Frang Sign Post Bkwy-3 in Rd 2.000 Each 619010744 Frang Sign Post Bkwy-4 in Rd 1.000 Each 619010770 Sq Tublr Slip Base Bkwy-3 in 2.000 Each 619011010 Delineator Des a 162.000 Each 619011040 Delineator Des D 12.000 Each 619011060 Delineator Des F 22.000 Each 619011087 Delineator Des Gj 6.000 Each 620010301 Curb Marking-yellow Epoxy 18.000 Gal 620011105 Words and Symbols-white Paint 34.000 Gal 620011110 Words and Symbols-yellow Paint 4.000 Gal 620011260 Words and Symbols-white Epoxy 22.000 Gal 620011265 Words and Symbols-yellow Epoxy 2.000 Gal 620012955 Temporary Striping 30,150.000 Lnft 620013000 Striping-white Paint 436.000 Gal 620013960 Striping-white Epoxy 291.000 Gal 620014000 Striping-yellow Paint 174.000 Gal 620014960 Striping-yellow Epoxy 150.000 Gal

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Impact Attenuating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents