Similar Projects
New T-Hangar - AIR-F-23-03 - City of Albert Lea
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Albert Lea, MN 56007

Plaza Street Water Main Extension - WAT-F-24-01 - City of Albert Lea
Infrastructure
Conception
$450,000 CJ est. value
Albert Lea, MN 56007

Stormwater Pond Construction - 4th and Front - STM-22-02 - City of Albert Lea
Infrastructure
Design
$360,000 CJ est. value
Albert Lea, MN 56007

2022 State Aid Overlay - Hammer Road - City of Albert Lea
Infrastructure
Design
$708,791 CJ est. value
Albert Lea, MN 56007

Blazing Star Trail, Cedar Avenue and Eddie Cochran Street Resurfacing Project
Infrastructure
Bidding
$700,000 CJ est. value
Albert Lea, MN 56007

Blazing Star Trail, Cedar Avenue and Eddie Cochran Street Resurfacing Project
Infrastructure
Bidding
$700,000 CJ est. value
Albert Lea, MN 56007

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Solar Power System Design and Installation Master
New Construction, Infrastructure
Post-Bid

2021 Stabilize And Pave Road Bed
Results
$1,002,500 est. value
MN

East Main Street Resurfacing - TH 65 to CSAH 38
Infrastructure
Results
Albert Lea, MN 56007

Replacement 14th Street Water Main - WAT-F-26-02 - City of Albert Lea
Infrastructure
Conception
$720,000 CJ est. value
Albert Lea, MN 56007

780th Avenue Pavement Replacement
Infrastructure
Post-Bid
MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Replacement 11th Street Water Main - WAT-F-25-01 - City of Albert Lea
Infrastructure
Conception
$300,000 CJ est. value
Albert Lea, MN 56007

780th Ave Pavement Replacement
Infrastructure
Post-Bid
MN

Last Updated 04/11/2023 05:37 PM
Project Title

Hayward Solar Project

Physical Address View project details and contacts
City, State (County) Hayward, MN 56043   (Freeborn County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Paving/Reconstruction, Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $128,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Information regarding the selected EPC contractor has not been released. To be considered for vendor opportunities, please email procurement@arevonenergy.com with details about your business, your contact information and the project or location for which you are interested in providing services. This information will be shared with the EPC contractor when it comes time. As of April 11, 2023, construction has been delayed. Please note that previously a 150 megawatt (MW) solar energy farm was being considered; however, the scope has changed to a 200 megawatt (MW) solar farm. Construction is not expected to begin until 2025.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents