Similar Projects
South Crest Drive - ST2216 - City of North Richland Hills
Infrastructure
Conception
$358,800 CJ est. value
North Richland Hills, TX 76182

Post Oak Drive - ST2221 - City of North Richland Hills
Infrastructure
Conception
$575,400 CJ est. value
North Richland Hills, TX 76182

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Main Street Gasoline Service Station
New Construction, Infrastructure - 10,000 SF
Design
$2,640,000 CJ est. value
Mansfield, TX 76063

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Integrated Pipeline Project - Section 19 Long Tunnel Crossings
Infrastructure
Post-Bid
TX

Internal Pipeline Cleaning
Term Contract
Results

KBR Yard Piping and Inlet and Outlet Modifications
Results
$40,000,000 est. value
Kennedale, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Murphy Express #8610 / Fort Worth
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Fort Worth, TX 76102

Harmony School of Innovation Infrastructure
Infrastructure
Post-Bid
Fort Worth, TX 76133

Last Updated 12/01/2022 12:34 AM
Project Title

12-inch Water Line Along Randol Mill Avenue From Morgan Road to Dove Road - 2022-33 - City of Southlake

Physical Address View project details and contacts
City, State (County) Southlake, TX 76092   (Tarrant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Funding is planned for right of way, engineering design and construction to upsize an existing 8-inch water line to 12-inch along Randol Mill Avenue from Morgan Road to Dove Road. JUSTIFICATION: Up-sizing this line will increase available pressure/flow in the area improving fire flow capability, increasing level of service and public safety for existing and future development. As of December 01, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents