Similar Projects
Combined Maintenance Facility - C114 - City of Aurora
New Construction, Infrastructure
Conception
$31,506,000 CJ est. value
Aurora, IL 60506

Pacifica Riverview
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Aurora, IL 60506

100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Aurora Central Catholic High School STEM Building
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Aurora, IL 60506

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Tennis Court Color Coating at South Mill Creek and Prairie Lathem Parks
Infrastructure
Bidding
$280,000 CJ est. value
Batavia, IL 60510

Hough Street ES and Sunny Hill ES
Renovation
Post-Bid
Barrington, Carpentersville, IL 60010

2022 Summer School Improvements
Renovation
Post-Bid
Algonquin, Carpentersville, IL 60110

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

2022 BHS Stadium Improvements
Renovation
Results
Batavia, IL 60510

Mooseheart Activity Center
Addition
Construction
Mooseheart, IL 60539

Resilience Education Center - Phase 2
Renovation - 31,218 SF
Construction
$5,000,000 CJ est. value
Aurora, IL 60505

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Charlestowne Lakes (Oliver Hoffman Property) Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
St Charles, IL 60174

Raymond Street Culvert Rehabilitation
Infrastructure
Design
$244,000 CJ est. value
South Elgin, IL 60177

Last Updated 03/14/2023 05:35 PM
Project Title

2023 Bond - Elgin School District U46

Physical Address View project details and contacts
City, State (County) Elgin, IL 60120   (Kane County)
Category(s) Education, Heavy and Highway, Laboratory
Sub-Category(s) Elementary School, Laboratory, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $179,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Update elementary school buildings and support expanded preschool opportunities for more students districtwide. Add and maintain more outdoor learning spaces and environments and update playgrounds and greenspaces. Increase the annual budget for maintenance and repairs by $10 million per year. Our schools represent a $1.5 billion investment by our district and its taxpayers, and increasing the maintenance budget will protect that investment by proactively maintaining and updating building infrastructure items like roofs, windows, electrical systems, plumbing and HVAC systems. As of March 14, 2023, this project is in the conceptual phase. An architect has not been selected. A bond election will be held April 4, 2023. Although a firm timeline for construction has not been determined, construction is not expected to start prior to March 2024.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents