Similar Projects
Solar Field
Conception
Coventry, CT

Durham Solar
New Construction
Conception
Durham, CT 06422

Solar Farm
Design
Enfield, CT

Plainville Methodist Church Solar
Design
$277,070 est. value
Plainville, CT

26.4 MW Solar Farm
Construction
Simsbury, CT

Nuway Solar Project
New Construction
Construction
South Windsor, CT 06074

Stonington Solar
New Construction
Design
Stonington, CT 06378

Tech Center
Renovation
Construction
$100,000,000 est. value
New Britain, CT

Southington Solar One
Construction
Southington, CT 06489

Torrington Solar One
Construction
Torrington, CT 06790

Solar Array
Construction
Torrington, CT

Waterford Solar Facility
Construction
Waterford, CT

Solar Field
Construction
Wallingford, CT

75-Acre Solar Energy Facility
Construction
Waterford, CT 06385

Bristol Solar One
Construction
$4,888,887 est. value
Bristol, CT 06010

Reported 04/23/2021 12:00 AM
Project Title

Boiler Plant Equipment Replacement and Utility Tunnel Connection

Physical Address View project details and contacts
City, State (County) Storrs, CT   (Tolland County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes installation of two (2) new package boilers at the Central Utility Plant (CUP), plus one (1) new boiler at the Supplemental Utility Plant (SUP). Installation of new plumbing, mechanical, electrical and controls to support steam and auxiliary systems. Support of Boiler Cleaning and Steamblow operations. Installation of miscellaneous structural steel, foundations and general civil, demolition, roofing, and painting. Boiler exhaust breeching and improvements to existing exhaust stack at CUP, installation of new breeching and exhaust stack at SUP.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents