Similar Projects
Water Treatment Plant
Design
Less than $7,400,000 est. value
Rouses Point, NY 12979

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Shoremont West 1 Water Treatment Plant Phase 2 Improvements
Renovation
Bidding
Rochester, NY 14612

Inspection, Testing, and Repair of Backflow Prevention Devices at Various Wastewater Resource Recovery Facilities, Pumps Stations and Associated Departments
Renovation
Bidding
$1,148,775 to $1,554,225 est. value
New York, NY

Tivoli Wellhouse and Wellfield Improvements
Post-Bid
Tivoli, NY 12583

Chadwick Lake Filter Plant Resiliency Improvements
Renovation
Post-Bid
Newburgh, NY 12550

Upgrades to the Water Treatment Plant's Junction Chamber and Pretreatment Buildings (AS)
Results
Yonkers, NY 10703

Wastewater Treatment Plant Flood Mitigation
Results
Endicott, NY 13760

Sleepy Hollow Lake WWTP Upgrade
Renovation
Construction
Athens, NY 12015

Village of Red Hook Sewer Project
New Construction
Construction
Red Hook, NY

Water Dynamic Corp Storage Building
New Construction, Renovation - 2,291 SF
Pending Verification
Less than $500,000 CJ est. value
Southold, NY 11971

Water Treatment and Cooling Tower Preventive Maintenance
Renovation, Term Contract
Bidding
Bronx, Kingston, New York, Staten Island, NY 10007

Sylvan Beach WWTP Site Soil Preload Project
Post-Bid
Less than $850,000 est. value
Sylvan Beach, NY 13157

Water Treatment Plant Improvements
Results
Less than $820,000 est. value
Lowville, NY 13367

Wastewater Treatment Plant - Phase I Improvements
Renovation
Construction
$3,800,000 to $4,300,000 est. value
Vernon, NY 13476

Last Updated 06/09/2022 01:41 AM
Project Title

Sewer District No 2 Equalization Tanks Odor Control System

Physical Address View project details and contacts
City, State (County) Ridge, NY 11961   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of equalization tanks odor control system at the Town of Brookhaven, Sewer District No. 2 - Wastewater Treatment Plant, 60 Ramsey Road, Ridge, NY 11961.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Packaged Odor Control Systems, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents