Similar Projects
Filter Vessel Piping Fabrication
Post-Bid
Less than $10,000 est. value
North Attleborough, MA

Water Main Materials
Post-Bid
North Dighton, MA

Pine Street Water Main Improvements
Results
Less than $1,950,000 est. value
Norton, MA 02766

Roy Avenue Water Main Replacement
Results
Less than $185,000 est. value
Attleboro, MA

Annual Public Work Material
Post-Bid
Dartmouth, MA

Rehabilitation of the East Filter Bed at the Wading RiverTreatment Facility
Results
Mansfield, MA 02048

Water Meters and Advanced Metering Infrastructure (AMI)
Post-Bid
Fairhaven, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Furnishing Ductile Iron Pipe, Hydrants, Hydrant Repair Kits/Parts, Gate Valves, Service Boxes, Corporations, Curb Stops, Gate Boxes, Polyethylene Tubing, Couplings, Hy Max Couplings, Transition Couplings, Repair Clamps, Service Saddles, Inserts and Thread Plugs
Post-Bid
Fall River, MA

Supply and Delivery of Miscellaneous Pipe Fittings
Term Contract
Results
Less than $17,000 est. value
North Attleborough, MA 02760

Installation of Approximately 8,700 Linear Feet of Eight-Inch Diameter Cement Lined Ductile Iron Water Main
Post-Bid
$2,000,000 est. value
North Attleborough, MA

Water Main Replacement Phase 19
Results
Less than $1,800,000 est. value
Fall River, MA 02722

Water Improvement Project - May Street and Lake Como Area
Post-Bid
North Attleborough, MA

Fire Hydrants
Results
Seekonk, MA

Elmwood Avenue Park Place and Lonsdale Avenue Cleaning and Lining
Post-Bid
$195,000 est. value
Attleboro, MA

Last Updated 05/24/2021 06:34 PM
Project Title

Water Main Replacement Phase 20

Physical Address View project details and contacts
City, State (County) Fall River, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all labor, tools, materials and equipment necessary for the removal and replacement of various size water mains and appurtenances including gate valves, valve boxes, hydrants, services and temporary bypass piping; and for all trench pavements. This project includes the replacement of approximately 7,400 linear feet of water main and appurtenances on the following streets: Bowler Street, Carr Street, Coolidge Street, Grace Street, Notre Dame Street, Pitman Street, Quarry Street, Reuben Street, Roper Street, Webster Street, and Weybosset Street.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents