Similar Projects
Valve Maintenance and Assessment Program
Term Contract
Bidding
Less than $45,000 est. value
Cooper City, FL 33329

Backflow Prevention and Plumbing Services
Term Contract
Bidding
Less than $200,000 est. value
Fort Lauderdale, FL

Generic Short Line Extensions and Relocations
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

South Middle River Forcemain Crossing Design Build
Term Contract
Post-Bid
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Regional Master Meter Improvements
Results
Less than $4,700,000 est. value
Fort Lauderdale, FL 33321

Reuse Connection Services for the Utilities Department
Results
Pompano Beach, FL

Utility Analysis Zone 123
Bidding
Less than $20,340,061 est. value
Lauderdale Lakes, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Replace Fire Hydrant Coast Guard Station Fort Lauderdale
Results
Less than $21,000 est. value
Dania, FL 33004

Water Service Line Replacement
Bidding
Coral Springs, FL

Reclaimed Water Transmission Main
Results
Less than $30,314,511 est. value
FL

Utility Locate Services
Results
Weston, FL

Repair and Calibration of Flow Meters and Related Devices at Regional Wastewater Treatment Plant and East and Central Water Treatment Plant
Term Contract
Results
Plantation, FL

Water Main Replacement Program Hollywood Boulevard to Sheridan Street Between N. Federal Highway(US-1) and N. 21st Avenue (14-5124) and Royal Poinciana Sewer Expansion
Results
Hollywood, FL

Hillsboro Boulevard (S.R. 810) Water Main Replacement / Directional Drill
Results
Deerfield Beach, FL

Last Updated 11/29/2018 10:05 AM
Project Title

Port Condo Large Water Main Improvements (P11080)

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description Eisenhower Boulevard and the Intracoastal Water Way, and includes the construction by the open-cut method of approximately 1,300 linear feet of 12-inch polyvinyl chloride water main to replace an existing 6-ich water main. The Project also includes, but is not limited to, the installation of new fire hydrants, reconnecting all service lines, testing, installation of air release valves and restoration of all affected areas.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents