Similar Projects
Last Updated | 04/18/2019 12:29 PM |
Project Title | Arroyo Hondo Segment 4 (Rancho Viejo Fire Station Trailhead To Old Dinosaur Trail) |
Physical Address | View project details and contacts |
City, State (County) | NM (Santa Fe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of the construction of a 1.52 mile long concrete multi-use trail connecting the exiting Rancho Viejo Fire Station Trailhead to the existing La Pradera Trail, and to the existing trail at the I-25 / NM 14 Interchange in Santa Fe County. Concrete sidewalk 6 inch (colored), earthwork, erosion control, rock gravity walls, two prefabricated steel truss bridges including drilled shaft foundations, seeding, and trail signs. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |