Similar Projects
Progressive Design-Build Services for the Clarke Creek Pumping Station and Force Main Project
New Construction, Infrastructure
Bidding
Charlotte, NC

Eden Remediation Program Contract IIA - Bridge Street Pump Station Rehabilitation
Renovation
Bidding
Eden, NC 27289

On-Call Corrective Maintenance and Repair Service
Term Contract
Post-Bid
Charlotte, NC

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Snow Hill Road Pump Station and Force Main Replacement
New Construction
Results
Less than $1,899,449 est. value
Durham, NC 27701

Groometown Road Water Booster Station
Results
Greensboro, NC

Brevard Pump Station Improvements
Renovation
Bidding
$500,000 est. value
Cleveland, NC

Public Safety Building Lift Station
Post-Bid
Atlantic Beach, NC

Pump Repair at Idols Pump Station
Results
Winston-Salem, NC 27101

Sanitary Sewer Pump Station Rehabilitations Project
Renovation
Bidding
Louisburg, NC

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Raw Water Pump Station Improvements
Results
Troy, NC 27371

Randolph Road Industrial Park Sewer
New Construction, Infrastructure
Bidding
Shelby, NC 28150

Highway 75 Booster Pump Replacement
Term Contract
Post-Bid
Monroe, NC 28112

Lift Station Pump Remediation
Term Contract
Results
Raleigh, NC 27610

Last Updated 11/30/2021 11:22 AM
Project Title

Water System Chemical Booster Station

Physical Address View project details and contacts
City, State (County) Salisbury, NC 28146   (Rowan County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work in this contract consists of construction of a precast concrete utility chemical building that will house four (4) chemical metering pumps, one (1) booster pump, four (4) chemical containment scales, and associated valves and piping. The Work also involves the construction of a 6-ft x 7-ft precast concrete, doghouse vault where the chemical will be injected into the water distribution system and instantaneously mixed with an in-line mixer. The Work is located at 1375 Long Ferry Road, Salisbury, NC .

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents