Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Wastewater Treatment Plant Improvements
Renovation
Bidding
$180,000 est. value
Ridge Farm, IL

Coldwater Creek WWTF Repairs and Improvements (2023)
Renovation
Bidding
$8,200,000 est. value
IL

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Screen Channel Upgrades
Renovation
Bidding
$25,000 est. value
Island Lake, IL

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Installation of Disc Filters and Other Improvements at The Hanover Park Water Reclamation Plant
Results
Less than $3,600,000 est. value
Chicago, IL

West Sewage Treatment Plant Improvements
Renovation
Bidding
$600,000 est. value
Crest Hill, IL

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Furnish, Deliver and Install Coarse Screensat the Stickney Water Reclamation Plant
Results
Less than $6,000,000 est. value
Cicero, IL 60804

Chemical Phosphorus Removal Facility - Calumet Water Reclamation Plant
Renovation
Bidding
$13,585,000 to $16,445,000 est. value
Chicago, IL 60628

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Last Updated 05/25/2022 11:15 PM
Project Title

Replacement of the Existing Candle Stick Waste Gas Burner

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing candle stick waste gas burner outside the digester building at the Village's Wastewater Treatment Plant with a Shand & Jurs (S&J) 3-inch 97301 waste gas burner with controls. Furnish all labor and equipment necessary to remove existing waste gas burner and legally dispose off-site. Furnish all labor and equipment necessary to install new 3-inch waste gas burner S&J 97301 with automatic controls or equivalent and appurtenances. Furnish and install one S&J 97130 thermal valve matched to the new waste burner, or equivalent by the manufacturer. Furnish and install new S&J 94406 flame arrester or equivalent. Complete and install all required electrical supply from building to new burner and control panel connections. Furnish all labor and materials (including fittings) to disconnect and reconnect the waste gas burner and restore operation of the new burner. Furnish and install gas pilot line to new waste gas burner for ignition.

Details

Sewage Treatment Plant, Renovation.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Gas Process Equipment, Waste Gas Burner System.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents