Similar Projects
Hominy Water System Improvements
Infrastructure
Bidding
$450,000 est. value
Hominy, OK

Sequoyah County Water System Improvements
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Sallisaw, OK

Plating Tank Repair
Post-Bid
Oklahoma City, OK

Construct Fire Protection Water Tank & System, Multi
New Construction, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK 73701

Water Tower Repair
Renovation
Results
El Reno, OK 73036

Kingfisher Disinfection Byproduct Reduction
Infrastructure
Results
Kingfisher, OK

Storage Tank Rehabilitation
Infrastructure
Bidding
$300,000 est. value
Wellston, OK

Construct Fire Protection Water Storage Tank ?? EM to see if same as 2185108- Tanks sizes are different but project dates/site visits exactly SAME
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK

Underground Storage Tank Removal - JHCC
Infrastructure
Results
$482,925 est. value
Lexington, OK 73051

Water Tank Rehabilitation
Alteration
Post-Bid
$350,000 est. value
Krebs, OK

Repair Water Distribution System, Multi
Term Contract
Results
$10,000,000 est. value
Enid, OK 73705

2021 WTP Clearwell
Infrastructure
Post-Bid
$1,100,000 est. value
Wewoka, OK

2021 Water System Improvements - Mingo Water Storage Tank Rehabilitation
Infrastructure
Results
Bixby, OK

2.0 MG Elevated Storage Tower - 33 Road and Kelly TWR-4
Infrastructure
Results
Edmond, OK

Tall I-35 Tower Rehabilitation Project
Infrastructure
Results
Edmond, OK 73034

Reported 06/09/2022 12:00 AM
Project Title

D/B - Dustin Water Storage Tank Project

Physical Address View project details and contacts
City, State (County) Dustin, OK   (Hughes County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to: Design and construct a 50,000-gallon elevated steel water storage tank with associated piping, fittings, valves, hydrant, and appurtenances to serve the Town of Dustin. Decommission, dismantle, and remove from the site the existing elevated steel water storage tank and appurtenances following construction and commission of the new storage tank. LOCATION OF PROJECT: All work shall be performed in the town of Dustin, OK. TERO: TERO is not applicable. CONSTRUCTION DURATION: Period of Performance is 270 calendar days from issuance of the Notice to Proceed. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $500,000 and $1,000,000, in accordance with FAR 36.204(g). SITE VISIT: Details regarding the Site Visit will be included in the solicitation. CONTRACT TYPE: The Indian Health Service intends to award a Firm Fixed Price (FFP) contract in support of this requirement. This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable evaluation criteria. NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES. For the purposes of this procurement, a concern is considered a small business if its average annual revenue for the last three (3) years is less than $39.5 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov. Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM. It is the responsibility of the contractor to check https://sam.gov/ frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available - all documents for proposal purposes will be posted at the website for download by interested parties. The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents