Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

The Peninsula Wellness Community
New Construction, Infrastructure - 100,000 SF
Design
$216,000,000 CJ est. value
Burlingame, CA 94010

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

RFP Construction Manager - CMGC Services for the Mountain View Transit Center Grade Separation and Access Project
Renovation, Infrastructure
Bidding
San Carlos, CA 94070

RFP Engineering - Redwood Shores Isolation Valve Installation Project
Infrastructure
Post-Bid
$175,000 CJ est. value
Redwood City, CA 94063

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Bowditch Middle School New Drama and Science Buildings
New Construction, Infrastructure
Results
$15,903,000 CJ est. value
Foster City, CA 94404

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

MBC BioLabs / San Carlos
New Construction, Infrastructure - 152,582 SF
Construction
$40,000,000 CJ est. value
San Carlos, CA 94070

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

Bell Lofts
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
San Bruno, CA 94066

Pavement Rehabilitation (CAPM)
Infrastructure
Conception
$18,225,000 CJ est. value
Woodside, CA 94062

Last Updated 10/31/2022 03:31 AM
Project Title

RFQ Contractor - Lease-Leaseback Construction Services for the Burlingame High School New Gymnasium Project

Physical Address View project details and contacts
City, State (County) Burlingame, CA 94010   (San Mateo County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $9,993,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Applicants must submit two copies of a completed prequalification package on forms supplied by the District and a financial statement, as specified herein. The value of individual bid package is, but is not limited to, $28.5 million. Pursuant to Section 17406(a)(2)(C) of the Education Code, all proposers for a Lease-Leaseback construction project under Section 17406(a)(1) must first be prequalified in accordance with subdivisions (b) through (m) of Section 20111.6 of the Public Contract Code. Accordingly, any Contractor (see definition below) who wishes to submit a proposal for the San Mateo Union High School District's ("District") Burlingame High School Gym Replacement ("Project") must first submit a prequalification application and receive notice that is has been prequalified by the District. Prime contractors must be prequalified and must hold either a valid "A" or "B" California Contractors License, and if used, mechanical, electrical and plumbing ("MEP") subcontractors must also be prequalified, whether they are being utilized as prime contractors or subcontractors. "Prime contractors" include general engineering contractors (see Section 7056 of the Business and Professions Code) and general building contractors (see Section 7057 of the Business and Professions Code). MEP contractors are contractors holding any of the following licenses: "C-4", "C-7", "C-10", "C-16", "C- 20", "C-34", "C-36", "C-38", "C-42", "C-43" or "C-46". All of the foregoing are "Contractors" who must be prequalified before submitting a proposal for the Burlingame High School Gym Replacement Project. Proposals will not be accepted from a Contractor that has failed to comply with these requirements. If two or more business entities submit a bid on a project as a Joint Venture or expect to submit a bid as part of a Joint Venture, each entity within the Joint Venture must be separately qualified to bid. Contractors who submit a complete pre-qualification package will be notified via email of their qualification status, such notice to be emailed no later than November 3, 2022. The District's decision will be based on objective evaluation criteria, using a uniform system for rating applicants. State law requires that the names of Contractors applying for prequalification status shall be public records subject to disclosure, and the first page of the questionnaire will be used for that purpose. Each questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Contractor on whose behalf that person is signing. If any information provided by a Contractor becomes inaccurate, the Contractor must immediately notify the District and provide updated accurate information in writing, under penalty of perjury. The District reserves the right to waive minor irregularities and omissions in the information contained in the prequalification application submitted, and to make all final determinations. A Contractor who has submitted a completed application form, and who receives a rating of "not qualified" from the District may appeal that determination. There is no appeal from a finding that a Contractor is not prequalified because of a failure to submit required information. Note: This Prequalification Application applies only to the District's Burlingame High School Gym Replacement Project. A contractor may be found not prequalified for either: (1) Omission of requested information; or (2) Falsification of information.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents