Similar Projects
South Rim Community Brush Mowing
Alteration
Post-Bid
$55,000 est. value
Stockton, UT

Landscaping Modernization and Irrigation, SLC UT
Term Contract
Post-Bid
Salt Lake City, UT 84116

Fairmont Park Stream Access and Beautification
Infrastructure
Results
Salt Lake City, UT 84106

Tree Trimming Services
Term Contract, Alteration
Results
Cedar City, UT

Springville Golf Irrigation
Alteration
Post-Bid
Springville, UT 84663

Tax Commission Building Concrete/Irrigation Repairs
Infrastructure
Results
$195,000 est. value
Salt Lake City, UT 84103

West Cove Strip Felling Project
Term Contract
Post-Bid
Richfield, UT 84701

Birch Creek Vegetation Management Project
Alteration
Results
Salt Lake City, UT

DFCM Construction - Pre Qualified General-UDOT Grassy MTN Rest Area Landscape Renovation
Term Contract
Post-Bid
$179,000 est. value
Grantsville, UT

Mill Creek Cut and Pile
Alteration
Results
Salt Lake City, UT

Tree Removal
Term Contract
Post-Bid
Riverton, UT

Cache Lop and Scatter
Term Contract
Results
Logan, UT

Lawn Care for National Guard
Term Contract
Post-Bid
Salt Lake City, UT

North Sheeprocks Watershed Restoration Phase 2 - Lop and Scatter
Term Contract
Results
Vernon, UT

Downtown Data Center Landscape and Snow Removal Services
Term Contract
Post-Bid
Salt Lake City, UT 84101

Last Updated 10/19/2022 11:32 AM
Project Title

Duchesne High Sports Fields

Physical Address View project details and contacts
City, State (County) Duchesne, UT 84021   (Duchesne County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The bid documents for this project include drawings and specifications prepared by KMA Architects and Geotechnical Engineering Study prepared by CMT Earthtec Engineering. The project's general scope of work consists of the new construction of a new high football field and stadium that includes a press box. General site work improvements consist of preparing the site for concrete and asphalt paving, and new utilities including drainage, stormwater, and electricity. New site elements including irrigation and landscaping. Subcontractors will carefully and thoroughly review the bid documents; satisfying themselves as to the nature and location of the work and the character, quality, quantities of materials and difficulties that may be encountered, the kind and extent of equipment and other facilities needed for the performance of the work and any other items which may affect the work or its performance prior to submitting their proposal. *Addendum 1 and 2 have been released. Questions on scope of work, trade coordination and bidding should be directed to Allen Lainhart at Westland Construction and Rob White at KMA Architects.

Details

2 Stories Above Grade, 2,130 SF.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents