Similar Projects
Replace Salt Creek Bridge
Renovation
Bidding
Rocheport, MO

Construction of a 150 Two Span Pre-stressed I Girder Bridge and associated Roadway
New Construction, Infrastructure
Bidding
MO

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Washington County Bridge Replacement
Results
Potosi, MO

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Highland Pedestrian Bridge
New Construction
Results
Saint Joseph, MO

Gene Field Road over North East Parkway Bridge
New Construction
Post-Bid
Saint Joseph, MO 64504

Rouggly Kiepe Road Bridge Over Trib to Saline Creek
New Construction
Results
Hillsboro, MO

13th Street over Corby Parkway Bridge
New Construction
Post-Bid
Saint Joseph, MO 64504

Last Updated 08/24/2021 09:02 AM
Project Title

Platte County BRO-B083(28) and BRO-B083(29) - Replacing Bridge 0510010 and 1560029

Physical Address View project details and contacts
City, State (County) MO   (Platte County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes: BRO-B083(28) Bridge 0510010. Removal of existing bridge, constructing new bridge and roadway approaches. The DBE Goal for this project is 7%. BRO-B083(29) Bridge 1560029. Construction of a 106 foot single span prestressed concrete NU-Girder bridge, approach roadway work, and any incidental work. The DBE Goal for this project is 8%.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents