Similar Projects
Island
New Construction
Conception
Westview, FL 33147

Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

French Drain Installation Project
Infrastructure
Bidding
$400,000 CJ est. value
Hialeah, FL 33013

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

DB MATOC - Corrosion Facility/Wash Rack
New Construction, Infrastructure - 19,500 SF
Post-Bid
$25,000,000 CJ est. value
Homestead, FL 33039

Virrick Park Aquatic Facility - Project B-40571
Infrastructure
Results
$6,238,045 est. value
Miami, FL 33133

Pool Cleaning and Maintenance Services
Term Contract
Results
Miami Beach, Opa Locka, Opa-locka, FL 33054

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Alton Bay Condominium Tower
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

115th Street Mixed-Use
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Miami Shores, FL 33161

27 Edgewater
New Construction
Design
$35,000,000 est. value
Miami, FL 33137

Last Updated 12/13/2022 09:46 AM
Project Title

Venetian Pool Structural and Pool Bottom Renovation - City of Coral Gables

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33134   (Miami-Dade County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,221,339 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE: https://www.coralgables.com/sites/default/files/2022-10/FY23-27%20CIP%20-%20Adopted%20for%20Web.pdf This project includes multiple facets of improvements and renovations at the Venetian Pool. Projects include improvements to the concession stand, structural improvements to the pool bottom, pool pump replacement and enhancement, chlorination system installation, and many other improvements. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of November 23, 2022, further details regarding design and construction have not been identified. ________________________________________________________ Repairs and renovation according to assessment to include: Repair of spalling in the vicinity of the door lintel level at the West side of the Southeast Tower, patching of window sill cracks in the Southeast Tower, repair of balcony slab spalling in the Southeast Tower, repair of deteriorated 2nd floor wood beams support at the Southeast Tower, loose steps at the stair of the Northwest Tower, repair of gable end wall cracks above the wood lintel at the East end of the loggia, repair of delaminated pool grottoes (new layer of concrete), patching of cracks at straight pool walls, repair of spalled concrete on sides of pool slab joints, patching/caulking of narrow to medium sized cracks throughout pool slab, repair of slab at main pool pit, repair of pool slab concrete spalling, full walkway repairs, full mooring post repair, repair of spalled concrete Venetian mooring posts, repair of concrete spalling and cracking in basement below pool's pump room, Historic Conservator services, Integrated Floor Coating system at pool basin slab, Integrated Wall Coating System at pool walls and grottoes. As of December 8, 2021, this project is included in the City of Coral Gables FY 2022-2026 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Per the owner, construction is estimated to take place in July of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents