Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Town Homes and Park Area
New Construction
Conception
Murrysville, PA 15668

The Residences of Providence Town Center
New Construction - 93,470 SF
Design
Oaks, PA 19456

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Scranton Veterans Memorial Park Project Phase II
New Construction
Post-Bid
$399,999 est. value
Scranton, PA 18503

Culliton Park
Post-Bid
Lancaster, PA 17603

New Tennis Facility
Results
Danville, PA 17821

Rochester Area Parks Rehabilitation War Memorial Park
Results
Rochester, PA

The Highlands at Wyomissing Expansion
Renovation, Addition - 6,000 SF
Construction
Wyomissing, PA 19610

Nova Place
Renovation - 26,000 SF
Construction
$2,700,000 est. value
Pittsburgh, PA 15212

3 Crossings Phase 2 - Building B - Office, Retail and Riverfront Plaza
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15222

Dover Highlands Multi Family Homes
New Construction - 12,750 SF
Design
Dover, PA 17402

Chestnut Ridge Terrace - Pavement Repairs, Parking Lot Seal Coat, Dumpster Enclosure and Playground Equipment Replacement Project
Post-Bid
Blairsville, PA 15717

2019 Tennis Court Rehabilitation Project
Results
Wampum, PA 16157

The Stacks at 3 Crossings
New Construction - 128,000 SF
Construction
$16,000,000 est. value
Pittsburgh, PA 15222

Reported 12/11/2019 10:43 AM
Project Title

Green Infrastructure Improvements Project

Physical Address View project details and contacts
City, State (County) Duncansville, PA 16635   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of one (1) raingarden and the replacement of a bituminous basketball court and stone walking trail with porous pavers and the associated erosion control and site restoration within the Duncansville Memorial Park located at the intersection of Park Drive and 8th Avenue in Duncansville Borough, Blair County, Pennsylvania.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents