Similar Projects
Pennton Road to Highway 18 Sewer - City of Lenoir
Infrastructure
Conception
$980,000 CJ est. value
Lenoir, NC 28645

Wall Amey Road Water Line Replacement - City of Lenoir
Infrastructure
Conception
$450,000 CJ est. value
Lenoir, NC 28645

Chipotle
Renovation
Post-Bid
Lenoir, NC

2-Year Asphalt Concrete Paving Contract
Term Contract
Post-Bid
Lenoir, NC

Improve Intersection at US 321 and SR 1109
Infrastructure
Results
$2,000,000 est. value
Granite Falls, NC 28630

Resurfacing, Milling, Patching, Shoulder Reconstruction, and Pavement Markings and Markers
Infrastructure
Results
$1,551,821 CJ est. value
Lenoir, NC 28645

Overmountain Development
New Construction, Infrastructure
Pending Verification
$130,000,000 CJ est. value
Lenoir, NC 28645

Zacks Fork Sewer Replacement - City of Lenoir
Infrastructure
Conception
$2,030,000 CJ est. value
Lenoir, NC 28645

Health Science Facility - Caldwell Community College and Technical Institute
New Construction, Infrastructure
Post-Bid
$23,000,000 CJ est. value
Hudson, NC 28638

Morganton Boulevard Water Line - Phase 1 - City of Lenoir
Infrastructure
Conception
$900,000 CJ est. value
Lenoir, NC 28645

Asphalt Resurfacing
Infrastructure
Post-Bid
$500,000 CJ est. value
Granite Falls, NC 28630

Main Street (Valway to 321) Sewer Replacement - City of Lenoir
Infrastructure
Conception
$980,000 CJ est. value
Lenoir, NC 28645

Shuford Recreation Center Splash Pad Improvements
Infrastructure, Renovation
Post-Bid
$110,130 CJ est. value
Granite Falls, NC 28630

Morganton Boulevard Water Line - Phase 2 - City of Lenoir
Infrastructure
Conception
$2,430,000 CJ est. value
Lenoir, NC 28645

Starbucks / Granite Falls
New Construction, Infrastructure
Post-Bid
Granite Falls, NC 28630

Last Updated 12/20/2023 02:03 PM
Project Title

Biscuitville / Lenoir

Physical Address View project details and contacts
City, State (County) Lenoir, NC 28645   (Caldwell County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

An awarded general contractor has been announced. Construction began December 11, 2023 and the restaurant will open April 2024.

Details

1 Story Above Grade, 2,753 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents