Similar Projects
Pier 5W Girder Temporary Shoring and Bearing Removal and Replacement
Renovation, Infrastructure
Bidding
$60,000 est. value
Jamestown, RI

High Priority Repairs on Bridges 062401, 075401, and 098601
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Smithfield, RI

Design Build Services for Route 37, Contract 3 (Bridge Group 51B)
Post-Bid
Providence, RI

Walking Path Bridge Refurbishment-Memorial Park
Post-Bid
Johnston, RI 02919

2020-CB-018 Bridge Group 32 I-95 Cranston
Results
Cranston, RI

Steel Repairs to Branch Avenue Railroad Bridge
Results
Providence, RI 02904

Bridge Group 45C H Cottrell Bridge
New Construction
Post-Bid
Westerly, RI

Pell Bridge Ramps - Phase II
Results
Providence, RI

Bridge Group 95 - Route 4/95 and Route 403 Ramps
New Construction
Post-Bid
Providence, RI

Bridge Group 59C - Reconstruction of Reservoir Avenue RR Bridge
Results
Providence, RI

Bridge Group 69E - Hunts Mill
New Construction
Post-Bid

Bridge Group 57J Browning Mill
Results
Exeter, RI

Silver Creek Bike Path Culvert Bridge
New Construction
Post-Bid
Bristol, RI

Design Build Services for I-195 Washington Bridge Phase 2
New Construction
Results
Providence, RI

On-Call Contractor General Bridge Preservation Task Order Program
Renovation, Infrastructure
Post-Bid
RI

Reported 04/30/2022 12:00 AM
Project Title

Fish Road Bridge Replacement

Physical Address View project details and contacts
City, State (County) Smithfield, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing the existing bridge on Fish Road over Sin and Flesh Brook. This project will include but is not limited to removing and disposing of the existing bridge, installing new foundation, installing buried precast concrete rigid frame superstructure, installing bridge rail and end posts, furnishing and installing pavement markings, removing and disposing signs, furnishing and installing new signs, roadway reconstruction for both approaches just beyond the ends of the proposed bridge, removing and disposing the guardrail and installing new guardrail.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents