Similar Projects
Reported | 01/29/2022 12:00 AM |
Project Title | Removal and Replacement of Two Roofs on Campus and Refurbishment of One Roof Off Campus |
Physical Address | View project details and contacts |
City, State (County) | Tucson, AZ 85719 (Pima County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The on campus work includes, but is not limited to the following: 1. Removal and disposal of the existing roof, base flashing system around perimeter walls, curbs, platforms, etc. Removal of insulation down to substrate. If there is any roof top equipment that is dead or is no longer used, the contractor will coordinate with the owner the removal of the equipment and if it should be disposed. 2. Remove and reuse existing wall counter flashing. 3. Remove existing lead flashings at all penetration and support, replace per Soprema Spec. 4. Check existing drains for debris and flow, provide new strainers and rings. 5. Install new tapered insulation system that meets manufacturer spec. 6. Install SBS base ply layer cold process applied 7. Over SBS Base ply, apply modified cap sheet, White granules surface, cold process applied. 8. Install wall flashing and curb flashings fabric reinforced 9. Install new Flashing system as specified. a. All pipe penetrations and or equipments supports, etc. b. Clean coping metal and apply Flashing at joints. 10. Antennas or Satellite dish supports and cables, remove if not used. If removal is not possible, properly mount and flash supports and provide correct flashing for cables. Coordinate this with the owner. 11. Remove all pitch pans and install the Flashing system upon completion of the roof system, refer to specifications. The off campus work includes, but is not limited to the following: 1. Cleaning of the roof surface. 2. Repair of all penetrations, curbs, Scuppers and details to match the manufacture specifications. 3. Scrapping and smoothing of existing roof system to allow proper adhesion of new coating system. 4. Application of aluminum binder coat. 5. Application of Base coat. 6. Application of two(2) coats Elastomeric Roof coating. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |