Similar Projects
Copper Creek Elementary School MPR Roofing Project
Alteration
Bidding
Oro Valley, AZ 85737

Reroofing of the Gym Building
Alteration
Bidding
Sells, AZ 85634

Roofing Repair and Maintenance
Post-Bid

Weatherization at Marana High School Old Gym, Cafeteria and Auditorium
Post-Bid
Tucson, AZ 85743

Cabeza Prieta NWR Roof Replacement
Results
Less than $25,000 est. value
Ajo, AZ

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement at Tanque Verde Elementary
Alteration
Post-Bid
Tucson, AZ 85749

Canyon Del Oro High School Roof Replacement - Phase 2
Results
Tucson, AZ 85704

Safford K-8 School Clay Tile Roofing Project
Term Contract
Results
Tucson, AZ 85701

Amphitheater High School Main Gym Roof Replacement Project
Results
Tucson, AZ 85705

Low Income Roofing Services
Term Contract
Results
Less than $121,425 est. value
Tucson, AZ

Mesa Verde Elementary School Roof Replacement Project
Results
Tucson, AZ 85704

Kino Event Center Roof Replacement
Results
$275,000 to $325,000 est. value
Tucson, AZ 85713

Cross Middle School Roof Replacement Project
Alteration
Results
Tucson, AZ 85704

Roofing Materials and Supplies
Alteration
Results
Tucson, AZ

Reported 01/29/2022 12:00 AM
Project Title

Removal and Replacement of Two Roofs on Campus and Refurbishment of One Roof Off Campus

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85719   (Pima County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The on campus work includes, but is not limited to the following: 1. Removal and disposal of the existing roof, base flashing system around perimeter walls, curbs, platforms, etc. Removal of insulation down to substrate. If there is any roof top equipment that is dead or is no longer used, the contractor will coordinate with the owner the removal of the equipment and if it should be disposed. 2. Remove and reuse existing wall counter flashing. 3. Remove existing lead flashings at all penetration and support, replace per Soprema Spec. 4. Check existing drains for debris and flow, provide new strainers and rings. 5. Install new tapered insulation system that meets manufacturer spec. 6. Install SBS base ply layer cold process applied 7. Over SBS Base ply, apply modified cap sheet, White granules surface, cold process applied. 8. Install wall flashing and curb flashings fabric reinforced 9. Install new Flashing system as specified. a. All pipe penetrations and or equipments supports, etc. b. Clean coping metal and apply Flashing at joints. 10. Antennas or Satellite dish supports and cables, remove if not used. If removal is not possible, properly mount and flash supports and provide correct flashing for cables. Coordinate this with the owner. 11. Remove all pitch pans and install the Flashing system upon completion of the roof system, refer to specifications. The off campus work includes, but is not limited to the following: 1. Cleaning of the roof surface. 2. Repair of all penetrations, curbs, Scuppers and details to match the manufacture specifications. 3. Scrapping and smoothing of existing roof system to allow proper adhesion of new coating system. 4. Application of aluminum binder coat. 5. Application of Base coat. 6. Application of two(2) coats Elastomeric Roof coating.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents