Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Seal Bituminous Pavement Cracks and Crack Sealing
Infrastructure
Results

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Grace Township Animal Dairy Production
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Montevideo, MN 56265

Grace Township Animal Dairy Production
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Montevideo, MN 56265

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Mill and Overlay, Underseal
Infrastructure
Results
Maynard, MN

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Application of Emulsified Ashpalt Seal Coat
Infrastructure
Results
$100,000 est. value
Montevideo, MN

Culvert Replacement and Bridge Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Montevideo, MN 56265

Road and Street Bituminous
Infrastructure
Results
$2,000,000 est. value
Montevideo, MN

Minnesota Veterans Home - Montevideo - Maintenance Garage
New Construction, Infrastructure
Post-Bid
$1,400,000 CJ est. value
Montevideo, MN 56265

Pavement Removal, Aggregate Base and Bituminous Surfacing
Infrastructure
Results
$410,000 est. value
Montevideo, MN

Chippewa & Swift Joint County Ditch No. 9 Bid Package #4
Infrastructure
Results
$656,520 CJ est. value
Kragero Township, MN 56262

Last Updated 11/21/2022 12:06 AM
Project Title

Resurfacing - TH 40

Physical Address View project details and contacts
City, State (County) Montevideo, MN 56265   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

TH 75 to Western Ave--resurfacing. As of November 21, 2022, the project is in Final Planning status. Anticipated letting date is February 24, 2023. MNDOT - Resurfacing - TH 40 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents