Similar Projects
Pulpit Rock Inn
New Construction - 34,685 SF
Conception
Warwick, NY 10990

Village at Whispering Pines Senior Housing
New Construction
Design
$86,000,000 est. value
Rotterdam, NY 12306

Barrett Hill Workforce Housing
New Construction - 1,800,000 SF
Design
Brewster, NY 10509

Rehabilitation of the Swimming Pool and Supporting Infrastructure at Franklin D. Roosevelt State Park
Bidding
Yorktown Heights, NY 10598

Water Slide for Park Pool
Post-Bid
Binghamton, NY

South End Pool Renovations
Post-Bid
Troy, NY

Municipal Pool Improvement Project
Results
Edmeston, NY 13335

Middletown High School Pool Upgrades
Results
Middletown, NY 10940

One Dutchess Avenue Phase I
New Construction
Construction
$100,000,000 est. value
Poughkeepsie, NY 12601

Pavion Apartments
New Construction, Demolition - 184,643 SF
Construction
$30,000,000 est. value
Nyack, NY 10960

Hoffman Senior Housing
New Construction - 53,000 SF
Pending Verification
Colonie, NY 12205

Summit Hill of Yorktown Townhouses
New Construction
Pending Verification
Jefferson Valley, NY 10535

Elmwood Preserve Senior Housing
New Construction
Design
Greenburgh, NY 10607

Municipal Pool Improvement
Post-Bid
Fleischmanns, NY

Replacement of Coping on Main Pool
Results
Lewisboro, NY 10590

Reported 08/05/2019 11:00 AM
Project Title

Improvements to Pool Facilities University Settlement Camp

Physical Address View project details and contacts
City, State (County) Beacon, NY 12508   (Dutchess County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work proposed by the City of Beacon includes, but is not limited to, the following: 1) Demolition and removal of an existing 16'x32' wood-frame building. 2) Demolition of existing 16'x34' pool equipment building. 3) Removal of existing backwash line from existing pool equipment building. 4) Construction of a new 16'x34' pool equipment building. 5) Construction of a new 16'x34 masonry block and wood frame rest/changing room. 6) Removal any existing vegetation to allow for the installation of the backwash filter waste line to the proposed holding tank and two proposed 1 story block buildings near the existing pool. 7) Installation of a 5,000 gallon tank with lockable covers as shown on the attached plans, installation of a high water alarm with tank sensors, 4x4 post with junction box, audible alarm in the newly constructed pool equipment building and vent tank as per plan. 8) Installation of a solid PVC waste line to a 5,000 gallon precast holding tank, with audible alarm to be installed in equipment building. 9) Minor site grading to return finished grade to existing conditions. 10) All disturbed areas shall be brought to final finished grade, seeded and mulch as per the plan. 11) Permitting will be performed by the City of Beacon.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents