Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Patching on I-55
Infrastructure
Bidding
$500,000 CJ est. value
Bloomington, IL 61701

Patching on I-55
Infrastructure
Bidding
$500,000 CJ est. value
Bloomington, IL 61701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Ground Maintenance of Public Park
Alteration
Post-Bid
Colfax, IL

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

5.36 Miles on FAI 55 (I-55), Class A Special Patching from SW of Bloomington to S of Shirley. 0.92 Mile on FAU 6406 (US 150), Class B Patching from Veteran's PKWY to just S of Woodrig Rd. 0.28 Mile on FAP 708 (US 51 BUSN), Class B Patching from US 51 to 0.3 Mile S of US 51
Infrastructure
Results

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Longitudinal Joint Repair
Infrastructure
Bidding
$500,000 CJ est. value
Bloomington, IL 61705

Last Updated 07/20/2023 04:44 PM
Project Title

Bituminous Material

Physical Address View project details and contacts
City, State (County) Gridley, IL 61744   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County :McLean Section No : 23-18134-00-SM Description: Some Items Include: 1,297 Ton - HMA SC Wedge IL-9.5 Mix "C" N50; 2,786 Lbs - Bit Mat'l (Tack Ct); 389 Sq Yd - HMA Surf Rem Butt-Jt; 1,335 Ton - HMA SC IL-9.5 Mix "C" N50; 547 Ton - Agg Wedge Shld Ty B; 1 L Sum - Traf Cont & Prot (Spl); Other Misc Related Items Project Location: 3200 North Rd: 1980 East Rd west 1 mile / 1980 East Rd: 3200 North to 1,600' south PREQUALIFICATION OF BIDDERS. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Bituminous Material This project consists of the reconditioning of two township roads with HMA slope correction and Surface course on oil and chip surface abutted by aggregate shoulders

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents