Similar Projects
New Fire Station
New Construction
Conception
$8,500,000 est. value
Colorado Springs, CO 80902

Longmont Fire Station 2 and 6
Renovation
Design
Longmont, CO 80501

Inter-Canyon Fire Station 1 & 3
New Construction - 25,500 SF
Design
Morrison, CO 80465

West Fork Fire Station
New Construction - 1,200 SF
Bidding
Dolores, CO 81323

New Fire Barn No. 2
Post-Bid
Less than $3,000,000 est. value
Boulder, CO 80304

Fire Station #4 Renovation
Post-Bid
Poncha Springs, CO 81242

Fort Lupton Fire Station 3 County Road 8 & Future Rollie Avenue
New Construction
Results
Less than $6,750,000 est. value
Fort Lupton, CO

Design for Fire Station in Crested Butte
Results
Crested Butte, CO

Police Station 2nd Floor Renovation
Renovation
Construction
Black Hawk, CO 80422

New Fire Station
Construction
Falcon, CO 80831

New Fire Station 1
New Construction - 15,000 SF
Design
$8,000,000 est. value
Evergreen, CO 80439

Construct a Detached Fire Station Support Building at Turkey Creek Complex
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Colorado Springs, Fort Carson, CO 80913

Lefthand Fire Protection District New Fire Station Number 1
Results
Boulder, CO 80302

Station 2 Construction Project
New Construction - 10,650 SF
Construction
Eaton, CO 80615

Fire Station 23 & Radio Shop Construction
Renovation - 3,360 SF
Post-Bid
Colorado Springs, CO 80910

Reported 02/10/2022 12:00 AM
Project Title

Frisco Police Department Remodel

Physical Address View project details and contacts
City, State (County) Frisco, CO 80443   (Summit County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate area of the remodeled project is 4,062 square feet and measured to the inside of the exterior walls and interior of the wall adjacent to existing rooms not a part of this remodel. Scope of work is to include: 1. Demolition - Walls, floors, ceilings, materials and finishes 2. Remodel/renovation of existing offices 3. Two new locker rooms (men’s/women’s) 4. Two bunk rooms 5. New kitchen (in existing kitchen area) 6. Storage areas (or as otherwise shown on the floor plan) 7. Server room to stay in current location - Limited or no access during construction

Details

1 Fire/Police Station, 1 Story Above Grade, 3,258 to 4,062 SF Renovation, Building.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents