Similar Projects
Grounds Maintenance & Snow Removal Services for Peterson AFB and Cheyenne Mountain AFS, Colorado
Design

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Bidding

Golf Course Irrigation System Design
Post-Bid
Commerce City, CO 80022

As-Needed Street Tree Removal and Stump Grinding Services
Term Contract
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Red Cross Memorial Plaza
Results
Less than $218,000 est. value
Aurora, CO 80045

Water World Alpine Springs Landscape
Post-Bid
Federal Heights, CO 80260

Modernization of Irrigation Valves
Results
Brighton, CO 80601

Tree Trimming Services
Post-Bid
Denver, CO 80229

Mowing Multi-Term
Results
Brighton, CO

Bulk Fertilizers and Applications
Post-Bid
Aurora, CO

F--Mass Planting
Results

Tree Maintenance Service
Term Contract
Post-Bid
Aurora, CO 80011

2021 Vegetation Management Services
Term Contract
Results
Brighton, CO

Purchase and Application of Fertilizer
Term Contract
Post-Bid
Thornton, CO

Reported 01/29/2022 12:00 AM
Project Title

Prairie View Middle School Synthetic Turf Design/Build

Physical Address View project details and contacts
City, State (County) Henderson, CO 80640   (Adams County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal from qualified turf contractors (proposers) interested in providing all labor, materials, equipment, and tools necessary for design/build (turn-key) synthetic turf system, including; demolition of the existing grass field, re-grading (if necessary), and installation of a new infilled synthetic turf field at Prairie View Middle School. A. Provide synthetic turf system consisting of: • Synthetic turf system that covers approximately 87,000 square feet (Asphalt D-Zone Excluded). • Preparation of both D-Zones (One for turf and the other for asphalt). • There will not be any logos or end zone lettering. • Any long jump runways and pole vault area will be relocated to asphalt D-Zone. • (2) new multi-function Football/Soccer goal posts with integrated soccer goals. • Prefer to use existing curb. • Field green turf with standard white (football) and yellow (soccer) line markings. • Option for Anti-shock pad. • Turf system shall be perforated for drainage with minimum infiltration rate of 14”/hr. • +/- 2.25” total thickness. • Water drainage and evacuation system consisting of properly sized drain. • Vertically draining porous stone aggregate base consisting of dual layered specifically sized stone. The first layer consisting of at least 4” deep crushed gravel base. The finishing layer shall be 2” deep and provide tight uniform finish surface over the base layer without settlement. • Perimeter edging. • Proof rolled and compacted subgrade. • Irrigation system. o Terminate and reroute all active irrigation lines from inside track to outside of track o No active irrigation can be under synthetic turf. • Geotextile fabric underlayment. • Regrade and add additional crush refines to existing track.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents