Similar Projects
Z2DA--Replace Boilers and Controls, Phase II (VA-20-00028010)
Renovation
Design
$5,000,000 to $10,000,000 est. value
Grand Junction, CO 81501

Synopsis- Environmental Remediation Services & Construction for Rocky Mountain Arsenal
New Construction
Design
Commerce City, CO

Fountain PFC Treatment Facility Superstructure
New Construction
Bidding
Fountain, CO

Water Chemical and Services
Post-Bid
CO

Wtp Treatment Chemical
Post-Bid
Louisville, CO 80027

Construction Manager for Wastewater Building Improvements
Results
Denver, CO

Water Treatment Facility Improvements Project
Results
Elizabeth, CO

Leadville Mine Drainage Tunnel Water Treatment
Post-Bid
$10,000,000 est. value
Leadville, CO

Fy2019 Wastewater Reclamation Facility West Overlay Project
Results
$250,000 to $300,000 est. value
Pueblo, CO 81003

Chatfield Basin Water Reclamation Facility
Post-Bid
Greenwood Village, CO 80112

2019 Water Treatment Plant Office Addition
Addition
Results
Pueblo West, CO 81007

Water Treatment Plant Maintenance Work
Post-Bid
Brighton, CO 80016

WWTP Blower Improvements
Results
Less than $300,000 est. value
Estes Park, CO 80511

Wastewater Treatment Facility Improvement Project
Post-Bid
Evergreen, CO

Wemlinger Wpf Filter Rehabilitation (#1 and #6)
Results
CO

Reported 12/18/2019 12:00 AM
Project Title

Water Treatment Plant Expansion Project

Physical Address View project details and contacts
City, State (County) Orchard, CO   (Morgan County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Construction Management - CM at Risk.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include the following: All necessary labor, supervision, equipment, tools, and materials to expand the Town`s WTP. This includes, but is not limited to, the purchase and installation of an additional Trident mixed media filtration unit, coordination with Trident regarding installation and integration of the plant SCADA system and Trident PLCs, modifications to process piping, modifications to various site piping, and a new roof on the WTP building. Work shall include installation of all electrical wiring, motor control centers, programmable logic controllers, all process piping, and completion of all associated site work relating to the expansion improvements as detailed in the specifications.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents