Project Title | Labor and Materials Needed to Remove,Supply and Install New AirCooled Water Chiller Systems at The Jefferson Parish Performing Arts Center |
Physical Address | View project details and contacts |
City, State (County) | Metairie, LA 70003 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $580,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | We extend this proposal to provide all labor, materials, delivery, equipment, and all other incidentals needed to remove two (2) existing Trane Air-Cooled Chiller Systems and supply and install two (2) new 200-ton Trane Air Cooled Water Chiller Systems, Model Number ACRB2005EUA*XUUCXNC2XFNLBKEV1TANXXXAAXXXXX0XX at the Jefferson Performing Arts Center located at 6400 Airline Drive, Metairie, LA 70001. A Louisiana State Contractor's License will be required in accordance with LSA R.S. 37-2150 et. seq., and such license number will be shown on the outside of the electronic bid envelope. Failure to comply will cause the bid to be rejected. When submitting the bid electronically, the license number must be entered in the appropriate field in the electronic procurement system. Failure to comply will cause the bid to be rejected." A copy of the license is not required by law; o 3.1 License(s) issued by the Louisiana State Licensing Board for Contractors: Mechanical Statewide Surety Bond: An Electronic bid bond will be required with bid submission in the amount of 5% of the total bid. The vendor shall indicate the electronic bid bond number in the location specified on the electronic bid envelope. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission. o Performance Bond: A Performance Bond in the amount of 50% of the total contract price will be required. The performance bond shall be produced upon contract execution. o Payment Bond: A payment bond of 50% of the total contract price will be required. The payment bond shall be produced upon contract execution. Bidders should submit all questions in writing via email to the buyers email address as indicated above, no later than Five (5) working days prior to the bid opening. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |