Similar Projects
Gilbert Street ROW UG Project
Bidding
$350,000 est. value
Mansfield, MA

Water Treatment Chemicals - Cross Connection Services, Sewer Camera Inspection Services, and Septic Pumper Services
Post-Bid
Somerset, MA

Filter Vessel Piping Fabrication
Post-Bid
Less than $10,000 est. value
North Attleborough, MA

Police and Fire Station Sewer Replacement Project
Results
Less than $105,000 est. value
Fairhaven, MA 02719

DPW Services - Catch Basin Cleaning
Term Contract
Results
Mansfield, MA

Water Main Materials
Post-Bid
North Dighton, MA

DPW Services - Catch Basin Cleaning with Sump Measurement
Term Contract
Results
Mansfield, MA

Annual Public Work Material
Post-Bid
Dartmouth, MA

Pine Street Water Main Improvements
Results
Less than $1,950,000 est. value
Norton, MA 02766

Produce and Grease Trap Maintenance
Post-Bid
Taunton, MA

Twin Village Fire Station Plumbing Repairs
Results
Less than $16,500 est. value
Attleboro, MA

Water Meters and Advanced Metering Infrastructure (AMI)
Post-Bid
Fairhaven, MA

Roy Avenue Water Main Replacement
Results
Less than $185,000 est. value
Attleboro, MA

Furnishing Ductile Iron Pipe, Hydrants, Hydrant Repair Kits/Parts, Gate Valves, Service Boxes, Corporations, Curb Stops, Gate Boxes, Polyethylene Tubing, Couplings, Hy Max Couplings, Transition Couplings, Repair Clamps, Service Saddles, Inserts and Thread Plugs
Post-Bid
Fall River, MA

South End Sewer Pump Station Replacement
Results
$3,400,000 est. value
Fall River, MA 02722

Last Updated 04/20/2021 02:42 PM
Project Title

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation

Physical Address View project details and contacts
City, State (County) Somerset, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $920,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will take place at the Route 6 Sewer Pump Station, at 1931 Grand Army of the Republic Highway, Somerset, and various streets and easements throughout the Town. The work consists of constructing replacement of an undersized building ventilation system and the electrical circuit feeding the ventilation system, installation of a wet well vent and odor control system, wet well ladder and grating replacement, concrete repairs to severely deteriorated surfaces inside the pump station structure, replacement of a section of deteriorated force main ductile iron pipe, installation of a permanent force main bypass, sewer pipe rehabilitation including cured-in-place lining, water main rehabilitation, site restoration including paving, and all other associated work tasks.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents