Similar Projects
AutoZone #5818
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Splendora, TX 77372

Home Depot Tool Rental Center
Renovation - 3,100 SF
Design
$350,000 est. value
Porter, TX 77365

Kohl's Sephora #11071
Renovation - 2,500 SF
Design
$300,000 est. value
Conroe, TX 77303

Abercrombie Kids
Renovation - 2,935 SF
Post-Bid
$250,000 est. value
The Woodlands, TX 77380

Dollar General #23544
New Construction - 10,640 SF
Post-Bid
$400,000 est. value
Porter, TX 77365

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

Construction of Water Sanitary Drainage and Paving for Magnolia Springs Section 1 for Sig Magnolia LP
Results
TX

Magnolia Place Phase I
New Construction - 41,000 SF
Construction
Magnolia, TX 77354

1488 Retail Center
New Construction - 15,000 SF
Construction
Magnolia, TX 77354

Burlington
Renovation - 25,116 SF
Design
$1,500,000 est. value
Conroe, TX 77303

Shenandoah Drainage
Alteration
Post-Bid
Shenandoah, TX 77384

IH0045-Pothole Repair
Infrastructure
Results
$75,750 est. value
TX

Sunglass Hut #5046
Renovation - 1,377 SF
Construction
$200,000 est. value
The Woodlands, TX 77380

Surface Treatment Various Precincts
Term Contract, Infrastructure
Post-Bid
Conroe, TX

Water Sanitary Drainage and Paving Facilities for Townsend Reserve Section 1 for Townsend Reserve
Infrastructure
Results
TX

Last Updated 01/10/2023 03:09 PM
Project Title

Shops at Walden

Physical Address View project details and contacts
City, State (County) Montgomery, TX 77356   (Montgomery County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $841,800 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a one-story shell building (Retail Center). As of January 10, 2023, construction is expected to start soon if it has not already. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

1 Story Above Grade, 8,418 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents